HomeMy WebLinkAbout2025_08_13 Town Board Minutes o
_ ��9_1_ Town of Mamaroneck
0 o Town Board Minutes
W 1� j m Wednesday, August 13, 2025, Courtroom, Second Floor of
n Town Center 5:00 PM
•
FOUNDED 1661
PRESENT: Jaine Elkind Eney, Town Supervisor
Sabrina Fiddelman, Councilmember
Jeffery L. King, Councilmember
Robin Nichinsky, Councilmember
Anant Nambiar, Councilmember
ABSENT:
ALSO PRESENT: Allison May, Town Clerk
Meredith S. Robson, Town Administrator
William Maker Jr., Town Attorney
Tracy Yogman, Town Comptroller
Robert P. Wasp, Town Engineer
Marc Romero, Assistant to the Town Administrator
Christine Canavan, Assistant to the Town Administrator
5:00 PM THE TOWN BOARD WORK SESSION
Moved by Councilmember Fiddelman, seconded by Councilmember Nambiar, the
meeting unanimously opened at 5:00 p.m.
Carried
WORK SESSION ITEMS
1. Discussion - 2025 Operating Budget Amendments
Town Comptroller Tracy Yogman reviewed proposed 2025 Operating Budget
amendments. Comptroller Yogman explained that several Ambulance District
expense lines exceeded original estimates due to premium increases, audits, and rate
adjustments, including liability insurance, workers' compensation, and state retirement
contributions. These increases are offset by higher-than-projected investment
earnings revenue.
The recommended amendments increase both revenues and expenditures, to
maintain a balanced budget. The Board discussed the workers' compensation
adjustment and confirmed that the figures reflect year-end totals.
2. Discussion - Q2 2025 Capital Budget Report
Comptroller Yogman presented the Second Quarter 2025 Capital Budget Report. As
of June 30, 2025, there are 89 active capital projects totaling approximately $75.6
million, with $54.4 million (72%) expended or encumbered.
Town Engineer Robert Wasp and staff reviewed the status of several ongoing
projects, including roadway resurfacing, sidewalk construction, crosswalk
improvements, and stormwater initiatives. Discussion included project sequencing,
coordination with NYSDOT and Con Edison, public communication plans, and
anticipated timelines.
Town Board
August 13, 2025
Board members discussed unspent balances, anticipated reallocations, and the status
of major projects such as the Town Center improvements, Senior Center work, and
stormwater mitigation projects.
See Attachment A.
3. Discussion - 2026 Capital Budget Initial Discussion
Town Administrator Meredith Robson provided an overview of preliminary 2026
capital requests, noting that this discussion was intended to gather initial Board
direction before staff-level review.
Fire Department representatives, including Chief Alex Rapp, discussed long lead
times for fire apparatus replacement and outlined proposed bonding timelines. Board
members discussed prioritization across public safety, stormwater/flood mitigation,
roads, and recreation, emphasizing the need to balance fiscal impact with operational
necessity.
Additional discussion included recreation facilities, Memorial Park shade options,
Hommocks Field improvements, ice rink needs, and Senior Center planning. The
Board generally agreed that public safety and stormwater mitigation remain top
priorities.
Marc Romero presented preliminary results of the Hommocks Pool Facility Survey.
See Attachments B, C, and D.
4. ADDED: Request for Executive Session
Moved by Councilmember Fiddelman, seconded by Councilmember Nambiar,
the Town Board agreed to enter into Executive Session discuss the
employment history of a particular person or persons.
Carried
Moved by Councilmember King, seconded by Councilmember Fiddelman, the
Town Board unanimously agreed to resume the Regular Meeting.
Carried
5. Discussion - 2025/26 School Tax Warrant
Town Administrator Meredith Robson presented the 2025/26 School Tax Warrants for
the Mamaroneck and Scarsdale School Districts, prepared by Town Comptroller
Tracy Yogman:
• Mamaroneck Union Free School District levy to be collected: $146,443,220.78
• Scarsdale Union Free School District levy to be collected: $7,067,383.96
No questions were raised.
6. Discussion - 2026 Budget Calendar
Town Administrator Robson reviewed the proposed 2026 Budget Calendar with the
Town Board. The schedule outlines key milestones for capital and operating budget
preparation, departmental reviews, and required submissions under New York State
law:
• August 1, 2025 — Completion of Five-Year Capital Budget worksheets for
review.
• August 22, 2025 — Completion of departmental operating budget input into
Munis and submission of budget narratives.
• September 19, 2025 — Finalization of departmental budget requests.
Town Board
August 13, 2025
• October 20, 2025 — Submission of the Tentative Budget to the Town Board,
with preliminary review.
• October 21 & 30, 2025 — Departmental budget staff reviews with the Town
Board.
• December 3, 2025 — Public hearing on the Preliminary Budget.
• December 17, 2025 — Final adoption of the 2026 Budget.
Board members discussed scheduling considerations.
7. Request for Executive Session
Moved by Councilmember Fiddelman, seconded by Councilmember Nambiar,
the Town Board agreed to enter into Executive Session to discuss the proposed
acquisition, sale, or lease of real property, potential litigation with the Village of
Larchmont, and the employment history of a particular person or persons.
Carried
Moved by Councilmember King, seconded by Councilmember Nichinsky, the
Town Board unanimously agreed to resume the Regular Meeting.
Carried
8. MOVE to Sept 3 Meeting: Discussion - Fire District Special Election
The Board agreed to move the discussion of the Fire District Special Election to the
September 3, 2025 agenda.
9. Pool Survey Follow Up
Marc Romero continued his presentation of the Outdoor Hommocks Pool Facility
Survey conducted between April 7 and May 7, 2025.
See Attachment D.
10. Updates
11. Changes to Regular Meeting Agenda
8:00 PM TOWN BOARD REGULAR MEETING
The Town Board meeting convened in the Courtroom Located on the second floor at the
Town Center. The Public was to view the meeting on cable access television (Optimum 76/
Fios 35) or on LMCMedia.org
CALL TO ORDER
The Regular Meeting of the Town Board was called to order by Town Supervisor Elkind
Eney at 8:04 p.m. The Town Supervisor noted that the Town Board met for a Work Session
beginning at 5:00 p.m. this evening, which was open to the public.
SUPERVISOR'S REPORT
The Town Supervisor reported that over the past several weeks the Town Supervisor had
the pleasure of attending meetings of the Recreation Committee and the Sustainability
Committee. The Town Supervisor expressed continued appreciation for the dedication,
professionalism, and hard work of the Town's volunteer boards and commissions, noting that
their commitment is invaluable to the community.
The Town Supervisor shared that the past month was filled with a wide range of successful
summer events throughout the Town, including the Senior Center summer barbecue, the
final event in the Summer Concert Series, the outdoor movie Mufasa at Memorial Park, the
Village of Mamaroneck summer block party, Swim Across America, the Town summer pool
party, ribbon-cutting ceremonies, Cops with Cones in Larchmont, National Night Out, and an
Town Board
August 13, 2025
80s-themed concert at Harbor Island Park. The Town Supervisor remarked that these events
are an important part of the fabric of the community and significantly contribute to the Town's
quality of life. The Town Supervisor thanked all staff, volunteers, and partners who worked to
make these events a success.
The Town Supervisor noted that Labor Day falls on September 1, 2025, and that Town
offices will be closed in observance of the holiday.
Finally, as summer draws to a close and the school year approaches, the Town Supervisor
urged residents to drive safely, particularly in school zones. The Town Supervisor reminded
motorists to remain alert, obey speed limits and traffic regulations, and be mindful of
children, pedestrians, bicyclists, and increased traffic during the back-to-school season,
emphasizing that the safety of residents and children depends on responsible driving.
RESIDENT COMMENTS
Supervisor Elkind Eney asked if anyone in the audience wished to address the Town Board.
BOARD OF FIRE COMMISSIONERS
1. Call to Order
Commissioner Elkind Eney called the Meeting to order, then on motion of
Commissioner Fiddelman, and seconded by Commissioner King, the Board of Fire
Commissioners was unanimously declared open.
Present were the following Members of the Commission:
Commissioner: Jaine Elkind Eney
Commissioner: Sabrina Fiddelman
Commissioner: Jeffery L. King
Commissioner: Robin Nichinsky
Commissioner: Anant Nambiar
2. Fire Claims 8-13-25
Moved by Commissioner King, seconded by Commissioner Fiddelman, it was
RESOLVED that the Board of Fire Commissioners hereby approves the
attached list of fire claims, as certified by Chief Rapp and submitted to the
Comptroller's Office, in the amount of$18,896.83.
Carried
3. Fire Report— July 2025
Commissioner Elkind Eney read the Fire Report for the Month of July 2025, as
follows:
ALARM TYPE NUMBER
Generals 37
Minors 31
Stills 9
Out of Town (Mutual Aid) 1
EMS 41
Drills 6
TOTAL 125
Total number of personnel responding: 968
Total time working: 66 hours and 12 minutes.
See Attachment E.
Town Board
August 13, 2025
4. Other Fire Department Business
There being no further business to come before the Fire Commission, on motion of
Commissioner Nambiar, seconded by Commissioner King, the Commission
unanimously adjourned and the Town Board reconvened.
Carried
AFFAIRS OF THE TOWN OF MAMARONECK
1. Consideration of - 2025 Operating Budget Amendments
Moved by Councilmember Nambiar, seconded by Councilmember Fiddelman, it was
RESOLVED that the Town Board hereby authorizes the Comptroller to make the
necessary budget amendments, as presented.
Carried
2. Consideration of - 2025/2026 School Tax Warrant
Moved by Councilmember Fiddelman, seconded by Councilmember Nambiar, it was
RESOLVED, that the Mamaroneck Town Board does hereby command the
Receiver of Taxes to collect the 2025/2026 Mamaroneck School Tax Warrant in
the total amount of$146,443,220.78, and
BE IT, FURTHER RESOLVED, that the Town Supervisor is hereby authorized to
execute said Warrant on behalf of the Town.
RESOLVED, that the Mamaroneck Town Board does hereby command the
Receiver of Taxes to collect the 2025/2026 Scarsdale School Tax Warrant in the
total amount of$7,067,383.96, and
BE IT, FURTHER RESOLVED, that the Town Supervisor is hereby authorized to
execute said warrant on behalf of the Town.
Carried
3. 2026 Budget Calendar
Moved by Councilmember King, seconded by Councilmember Nambiar, it was
RESOLVED that the Town Board hereby approves the 2026 Budget Calendar as
presented.
Carried
4. Consideration to Adopt - "Creation of new Parking Permits in the Town's
Parking Lots" Law
Moved by Councilmember Nambiar, seconded by Councilmember Fiddelman, it was
RESOLVED that the Town Board hereby adopts the "Creation of new Parking
Permits in the Town's Parking Lots" law, as presented.
Carried
5. Consideration of Certiorari
Moved by Councilmember King, seconded by Councilmember Nichinsky, it was
RESOLVED that the Town Board hereby approves the settlement of the tax
certiorari with Comstock Maxx 690 LLC for the mixed-use property at 690
Mamaroneck Avenue, resulting in a refund of$290.00 from the Town.
Carried
Town Board
August 13, 2025
REPORTS OF THE COUNCIL
Councilmember Nambiar
• Reported on matters related to the Housing Authority, noting that there are several
vacant townhouse units at the Hommocks Park Apartments currently available for
application. Stated that the units are a valuable Town asset, encouraged eligible
residents to apply, and noted that applications are available online.
• Referenced his attendance at numerous recent community events during the summer
season.
Councilmember Fiddelman
• Reported attending a Zoning Board of Appeals meeting on July 23, 2025, and
commended the Board for its dedication and hard work. Councilmember Fiddelman
noted that the Zoning Board does not meet in August, but will hold a special meeting
on September 4, 2025, and a regular meeting on September 24, 2025.
• Also reported participating in Swim Across America by swimming in a pool to raise
funds for cancer research. In addition,
• Attended an open house at Coop Camp with the Town Supervisor and highlighted the
program's expansion in enrollment and age range served, including teenagers, as
well as its role in serving underserved youth and preventing summer learning loss.
• Further reported attending National Night Out and highlighted the participation of the
Town Police Department, Fire Department, and Volunteer Ambulance Corps, noting
the value of these events in helping children become familiar with emergency service
personnel and feel safe in the community.
Councilmember King
• Gave kudos to the Recreation Department, stating that the department consistently
sets a very high standard each summer.
• Shared positive feedback based on personal experience with the Teen Camp
program, noting the importance of providing meaningful recreational opportunities for
teenagers.
• Encouraged residents to take advantage of the Town's recreational facilities, including
the pool and Sheldrake facilities.
• Attended a Recreation Committee meeting, which included presentations from
consultants regarding potential shade improvements at Memorial Park and new
technologies to enhance grass growth at the Hommocks fields, noting that both
presentations were informative and will continue to be evaluated.
Councilmember Nichinsky
• Attended a Sustainability Collaborative meeting and noted that there was a full
agenda.
• Shared that although unable to attend a recent Planning Council meeting due to the
Town Board meeting.
• Attended numerous recreational activities and events throughout the Town over the
past month, including events in Constitution Park, Parker Park, Larchmont, Harbor
Island Park, the Emelin Theatre, and the Town's summer concert series.
• Remarked that the Town offers a wide variety of activities and amenities, expressed
appreciation for the community, and encouraged residents to enjoy the remainder of
the summer.
TOWN CLERK'S REPORT
The Town Clerk announced that poll worker training will be held at the Town Center in
September for anyone interested in working the November election and encouraged
interested residents to contact the Town Clerk's Office for more information.
Town Board
August 13, 2025
The Town Clerk also shared that Veterans Appreciation Day at Playland will be held on
Sunday, August 31, 2025. Eligible Westchester County veterans may request up to six ride
bracelets and one parking pass by submitting a request prior to Friday, August 29, 2025.
TOWN ATTORNEY'S REPORT
The Town Attorney remarked that it has been an enjoyable summer for baseball fans, noting
that both the New York Mets and the New York Yankees remain in the playoff race. The
Town Attorney expressed optimism that both teams could perform well over the coming
weeks and advance to the postseason, observing that once in the playoffs, anything can
happen.
ADJOURNMENT— The meeting continued in Conference Room A to carry on the Work
Session
Moved by Councilmember Fiddelman, seconded by Councilmember King, the Town
Board agreed to enter into Executive Session to discuss the proposed acquisition,
sale, or lease of real property, potential litigation with the Village of Larchmont, and
the employment history of a particular person or persons.
Carried
On motion of Councilmember King, seconded by Councilmember Nambiar, the
meeting was unanimously adjourned at 10:33 p.m.
Carried
REGULARLY SCHEDULED MEETING - September 3, 2025
Respectfully submitted by
Allison May, Town Clerk
Town Board
August 13, 2025
Attachment A
- Q2 2025 CAPITAL PROJECT STATUS
•
p PROJECT DESCRIPTION ANA c.w, wr.mx.M woo. 17.1140En swan vW A.. STATUS
H4133 Ambulance Radio Equipment 5M 23 Other Ambulance m sxrexm SdWM wen wee, On order
1.133 MEMO Ambulance-tumnurdohairo SR 23 Deer Ambulance s AR.m - 2,550 .vex Now project not started
'H4133 M£MS Ambulance-Podable radios SM 23 00er Ambmnrce 6 AAA. - AAA. 55. I7rogres4 _
NA159 LVAC Electrical Upgrades SM 24 Town Bradkg warren Ambulance 3 ttwa.0 6 22m2M are. Purchase Order Issued In Jan 25
IM161 P.54rs1Com0Wnicallons EqulPAmbulence 534 Other Ambulmca I ®,6w.m 52511.0 eta AA c.o..a Clow Prefect
H416S HEMSOIRce Furniture SM 24 CAW Ambulance s tea.. 4o1.n 14Me. or. 2024 prole.,
Nn72 Chevy Tahoe Fly Car-2024 SM M Oder Ambulance _.I r0.W0Ae ...Om-.3 v,xr.ar wM ores On odder
H3672 FIRM Cary Building Dept B 24 Buren Dept Building is OA.. 4240M or. TO be Wrohao.d in 2026.
Generator Ordered 12124.Bid proposal for Installed.
H1603 Town Centel Generator ♦ 24 Torn Building Improve_Beding&Grounds 6 14t,16119 ARM 1 41150610 maassm erre _ Ass on 7J16 TB agenda nor award
Contractor proposal through Gordian Job Order
H1614 Town Center Flooringdst and 2nd floor A Town Building impress Building 6 G161.25 i 1x127ao0 nt.naw evil Anew COW-Ming service in progress
Contractor proposal through Gordian Job Order
H1614 Town Center FloodrgAd0nir0terk A 24 Town Building Impress Building&Gr w,. 3 ..021911 - me.0 or. A0,m,w. Contracting service in progress
Contractor propoll through Gordian Job Order
111614 Town Center Flooring-Ponce A 44 Town Binding imprms Building&Grounds 3 sera. 1,500.00 sex ... CordMillg serrite in progress
1.11614 Town Center-Women,locate roam!Relocating offices A 23 Town Building Impro,. [falaing 6 Grounb I "Rare:° ur,311.T 5 g47M MAIL. mr Am. Wehing for final bills
H1614 Town Center Painting-Police A 24 Town Bulldl no impress Builpng&Grow. 3 1040O,N 26,em.M one ey,w Mlke to get quote for PD areas to be painted-egg
Commmer proposal through Gordian Job Order
H1614 Town Center Backup boilers A 24 Town Building hnpmvo Balchg6 Grounds 1 wee. seam. ore x...v... Contracting sone.e In orngress
111614 Town Center ATV with Snow pia. A 24 Town Balding warms Bul2blg6GrnuWa 1 00952.05 Aran.. Proposals received from binnet peening under review
Contr.Awarded,Constriction start delayed due to
H1690 Town canter-LMCTV A 23.Town Building Improve Bolding&Grouch 1 awawm 16,551.30 6 1m14x50 55pme4 win ®.a,,,.10e VerMon equiprnem Iowa
Wore planned es change order proposal under Annual
H7140 Shddake D%VewaylRallhlge A Town 6ulHuq lepers Bu/MIW&Grouds 1 0652M HAM. ram en. Road meurloting contract in 2024
1.16703 Sr Cinder Building improvements-Generator A 25 Commenly&xorr 1 1wrm. 3AR.:2 Ie2wM win w.® Awaning_CBDG agreement
I16759 Se Center Building improvement.Yellow room A 22 Tenn Building Improve Community Seas 1 44a0RM NJ...5 15,025.40 AA,. omx macrame, CO0,maTgon contract on7/15 TB Agenda Mr award
Sr Center Building Improvement.(Include dnne110n ham McGuire
H6764 FouMatlon) A 22 Town Building Improve 000044nHv Swim 1 261e.12 Mauro m m_Gonshucti0n contract On 7115 TB Agenda for award
H6154 Sr Center Building Improvements Exterior A 24 Ton Building imp... CammanIy Sous s ur,em_m . 357..50 wax 15022apr PoltPoned to coneldeellon In 2024
H6756 Sr Center-Heat pump _ A 24 Commmmy Sams Community Sews 1 tin, _ wawa. wax 1Wir2101 COpsbeCtip0eontract on 7115 TB Agenda for award
Hd722 Sr Center Bus-20 Pweengen 2024(Vehicle 074) A 24 Vehicles&Equip Community Sawa 3 tgnaa sows.. cox a 0e held until.arty 2025 when ag70M will be evellede.
Q2 2025 CAPITAL PROJECT STATUS
PROJECT DESCRIPTION sum vn •anwv o.wwm.i wooE1 am01910111 auo0. .�,,, ram, - STATUS
H1069 Financial Enterprise System • 21 Info Techoogy Comptroller I 32e12Am 4e.1A0n.43 s mace s1AmR AAA Ana... Tan module tote implemented in 2025
H3530 Conservation halts replacement rallln5p A Other Conservation s st,a0.m r1A10M 04597.12 ones e01Ad Pyle.will be revisited in fall 2025.
H6553 Gardens Lake-Forebey Feasibility Study A I Oder calteew4000 6 HAMa.N 42A4.1a 6 24A40M WM.. a511 MM. Dralreporifindings are expected summer 2025.
9ubeentially c0mpbeter-Awaiting tube/Ode panels 4n
H2496 Fumelure-Engineering A Oder Engineering1USN.s o v.0u.o I aR2M aarsm _ r®q.e hackertler with vender
HUH Fite angina delivered in July 2025.Outlining is In
2007 Fire engine pumper SF TJ Vehicles&Equip Fin 2 1,046.426re ieseaexas 5522.71 ur _ ....A. progreu.
H3220
Computer Server-Fire Dept _ SF 24 Into Technology Firs a 3e02110 22Amd I 4410M lamas w o._r On order
Fire engine delivered In July 2025.Outlining is in
113432 Fire Apparatus-Replace Fin Engine 1137 fStarm lute) SF 22 Vehicles&Equip FM I IMAM. OnO.w.ss 11A22A2 Es. m,m.i.l progress.
143405 Soot Airphe SF 24 Other Fire I 661M024 41,1et se 3 4uM6a0 0009006 wee es.* On order
113495 New Equipment(Lone.Uonab0nj SF 22 Other One s 1r,mao mores 1 totem 4M7.0 omx I.r.n-- In grognu
316009 20 Yard Garbage inch SR 23 Vehicles&Etude Garbage a MAMM 1.11451 I 2H,4m.R 42,39600 sex coma. On order
H9009 Garbage Trucks SR 29 Winkles&Emile Garbage 6 541.162.55 4.AM 2 524.41621 MAMA, cr. Balance to to used lm 2025 garbage trucks
H6610 Garbage Comm Incinerator _SR 25 Garbage s d1A69.50 4ose 452A5112 over 2e2.. In design-will be a 2026 project
H0410 Dam Improvements-Bypass Mnn0orirgNage Control A 23 Outer Highway s 21.001.0 . 3 11.72M xt0u460 we www Design In progress with Town Consonant.
Remaining funding from developer fees.Will review to
see it funds can be used for green Infrastructure
H336t Madison Avenue Signal B to Roadway&Highway Highway 6 smear ate an.w5.a seeress «. we.. project on Madison Ave.
Final
H3361 Tra is Signal Replacement-RlphbelllPalmm 6 24 Roadway&Highway Runway 6 1RA1Le0 2am_w I 6122.n st4AMar new etc. .12.115ernee documents paled for
nt in August
Award of engineering consultant comma on 1115 TB
H5650 Rockland Bridge A 2a Roadway
oady 6 Highway Highway 6 wl4w.w 2m ary mew agenda
genda
115092 East Valley Stream Bridge-Storm Ida Damages-Permanent A 22 Roadway A Highway 14Mheoy 6 1,229,101.1e ..0-61 s warm 25.24263 cue ..... Project Completed-Waiting for goal bill
N6163'Generator-Highway o , . 00000bea A Egop Highway 6 11,977, 66.2t16 we. swore _Complete
H6164 Rned,,SldewMb,Curb. De 25 Roadway 6 H'0 97 Highway I 109,515.5l 2Aa451 Mims, mew Cm.. 2025 contracts merged
515105 Dump TnJrk-B Wheel(Sleek Top) De 23 r V1112Ie5 A Equip Highway 1 2M,11Aw minus 6 145.5e1.52 IIA04.M ore. m... On order
H5106 Reposer Hybrid Truck DB 23 Vehicles&Equip Highway I memos
mRe.R we. To b,reallocated
Hslu6 Dump Truck(10 wheel)with salt spreader OB 24 Vehicles 6 Equip Hgimay I 2euu615 trews.a 1n,7e615 IOIs6u we. uxxx On order
H513s Storm Wm.-Drainage Study 0B 23 Storm Drainage H9Areay I 1121M2.0 seWw2As 5 614405M 141se.52 A. new. In Design
H5162[Waverly Ave Bridge A 22 Roadway 6 Highway Ngherni 6 Veer... Mee...1 54.11J5606 1.5.11 era. 0ran.e Completed.Funding to be received
Town Board
August 13, 2025
Attachment A (Cont'd)
122 2025 CAPITAL PROJECT STATUS
PROJECT DESCRIPTION c.0.1000 E .o. ere ee
g ruxD TO wp,wm evreT aweem ellern STATUS
Replace Ford F550 wan utility body for tree epordng bole and materials and
H5172 slow removal DB 23 Vehicles Epolp Highway s 1403a.45 a],anss 5 Ace.. been.r nee. owes. On ardor
Sidewalks&Curbs-Howell Ave Nee JeRSN Chatewratld Edpeweed&N Chat.
H3173(2024) DB 24 Roadway&Malear Highway s 5,.110E blab I - _ E.00saa ae. um,4.. Completed will close
.sign resumed following confirmation of funding for
H5100 Madison Ave Green Improvements lGIGPI DB 22 Roadway&Highway HOW, s iassereas ta7tee0 a 11Are 1,E610aw am e.re Roundabout,Eapaeted bid advertisement in fe112025
Redesign for value erpineedng In em.re44.gas e1
X6161 Sign Shop-Storm Is/Ms DB 22 Town Balkans improve How 5 sae,120 ut,so.w 3 .. 7.103,147.m rew ®® PLA CS Pennod.
MISS Roundabout DB 24 Highway s a003030 a220200.m as Het slotted yet
5750OT Master Agreement executed.Engineering
H51.55 Colonial Ave Sidewalk DB 24 Xigaeey I 15,re.re 1.110.00.50 Dew mewl design Proposals received under review.
H1620 Computer Software/Hen:Rare A Info T00002ln.n IT 4 1EE711 25.111256/ 1a 101224.E wee renew Equipment on order
H1620 Sarver RlTlacemef A 24 Ido Techrwbs, IT I 00W.00 23.710591.s coulee .23 Own ouw EqulpmM1 on order
H1620 Laptop purchases A 24 info Technology 11 5 re.wso r,vE® E.6M.0 0w. Balance for new!epics.at[waded
H1820 UPS Backups A 25 000 T.elval0W R 4 E400.00 vre went In planning stage
H31103 Police-Virtual Reality Training System B 2a Term Bendinglrr0003e Pdke / Mere. s M,ao.w 14104M eere ....vim Additional menuhw will be purchased.
X3172 Pollee Vehicles-Three hybrid Radio Patrol Cars-2024 B 24 V01Ie6 Equi Poilm s 1ranrls - 1 - r5sv.re 11,,4416 read r.r On order
H3177 Polk-license pate reader B 24 Other Pella / 41. - 41e00w ors - Net porchwed yet
H3166 Police Evidence Locker B 24 Town Baadlw Improve Police a M.O. An. 14A10,50 rend Police may reed funding
On Rohl-Consultant sapping for narked needs and
H7126•Pool Improvements A 22 Resr4eden Facilities Rearm.. s 5,3111. 1A05000.50 2,a33,m0. 0rae or we Oranolel evaluation In progress
H1140 Sheldmkelmprovenw.4S-Retdning WWI A Other Reereatw s Leaver E,1m.1e 16.63 see Not aortal yet
Cnnt1ee0r pm5osal through Gordian Job Order
H7140 Shebmke Boller Replacement A Town SWlding Imams 0er4e.00 12.r0.1n 12,055. reel Cnntractng service In progro0/
Design dewlap,.aro is...named.Projen Ms been
X7224 ice Rink-Skate ReM1 A 24 Ramatbn Facilities Recreation 5 tderr.St ;er.r 5 20100 11amen 0ca sow .E.q..ned to 2026.Additone,ferallrgk needed.
gawk.[develop...with AI Engineers reinitiated.
H6123 Sanitary Sewer Pump Station 3(Baldwin Ave) SS 24 Sanitary Saner Sanitary Serer a asses. vwr.M - S20,M* epee were _Design process will continue for the remainder of 2025
_Xl000 Comprehensive Plan A 20 01be. Town Supervisor 4 144a0a0 I 67,w4.33 i Tn0.00 ',bee, 0c. Ill1Plementatnn Pan In progress.
H1364 Rya lake Filtration SW_ Water System Water 1 E1120,009a0 1,t11,40200 s 32 wawa 00. ...e.. Conaorl Lien bid In review
H1366 WaterIMmstmctkre Pepin. SW 24 Water Syemtn WMM i na,0oaw i gerecter m0.m0.w Orr _Water Peeing as needed
P1366 Acorn Lane Water Main SW 20 Water System Wafer s Hewes 264564 s wawa. . new ...me. Complete-welting ler final bill
111007 Park Lane Sterege#2 SW 24 Water System WOW 1 479ar.r a,wita 5 wqr _ - wee ,nee,w,r..oe I0 progmaS
92 2025 CAPITAL PROJECT STATUS •
0 _ PROJECT DESCRIPTION row va uee
ca�i.aaw Cl0..m.,,r eliMet
OODreT 5TWOFms BUDGET Cnwx rx.. STATUS
H1399 Ronslco Res.rvoh-Water Sapp Env(Consent Decree) SW 25 WWrSystem Water s 0el,128e0 clan
- 1620715.35 re. Not storied
I
H1400 Waverly Bridge Water Males SW 24 Water System Well s r,OWA) _6 - 0m. r-.e4a CCmPleted-waiting for final billing
H1261 Brookside Place Water Main SW 24_ Water System Water 0 250.179.51 5315512.r E1.to re. roes.. COR�oted-Walling for final tall
111402 Lead Semis.Line Replacrraot)Consent B&NMI SW-25 Water System Water a MACH 162,E1,8) &os+.n rat await In design
H1403[Kenilworth Booster-Phase 1/2 SW 25 Water System weir 1 MaEAa 21,261,E 5 2,ou,u - sell •e.yr In progress
H1404 Trails End Water Main SW 24 Water Synmm _ WEN n0, E,0etTr 24e33ra - i pen mn.vre. leprOgress
H1404 Kenilworth Booster-Phase 3 SW 24 Waren System Water 16.4111. 14310.99 2lpret - own d.n,o.. In progress
H1407 Winged Foot Tank Accsae SW 25 Water System Water w,or.M waves _we. New project not started
H3167 Police Comm Equipment-portable radios B 25 a ,[.ores
Not shaded
Ii317 Police Vehicles-Thew hyttd Radio Pabot Cars.2025- B 26 a ,3rBMe5 - 5 a rear or re.. On order
In design developnvnt 8 DOT p,rmlttl0g.Conetr]0Don
1133W43411 Pedestrian Crossing Signal.LeaHantocking Trail a 26 r00nm
/ _ um.,
ern ww, a3pected In h112025
H3911 To be purchased In 2020.Will raid an additional 4200k
2025 Fire Pumper Replica 2010 Fim fta,eue SF 24 / 1 nawes0 t rEOw.r ,
. per cugeM estimate.
H3429 Concrete Pad SF 24
/ teems. useeseo ewes new ...woo. Ir progress
H3426 Shad roof supplies for lifeboat SF 24 r Somas Weer sew m..w,nwd I2 pmo revs
H3139 Highway Garage Fire Alain DB 25 i _aMIAO s 1,e31W wawa wiv mdea0nu. System Instoledd,pending punchliet closeout kenos
H5173 Sidewalks&Curb,-Howell Ave balance of sidewalk 0B E.E w
25 5 1044 awn Imen one Contract awarded,construction In progress -
H72S4 Ice Rink-Security Canvass A 25 s MOM.. 20E412 ],1€.r wen _. Pm]eel Completed will close
OPEN Total N 75,508,134.59 S 17,362,351.54 5 31,042481.01 $21,199,333.41
•
Town Board
August 13, 2025
Attachment A (Cont'd)
• 02 2025 CAPITAL PROJECT STATUS
\ rarramwra , e.ow•ewrr•
p PROJECT DESCRIPTION r w,ue,y a[WwT0, euwn r* EXACT •er nw STATUS
CLOSED PROJECTSHIRO
a Town CenterIWAC A Town Building implore SIICAg&Grim* s 4,e353e Cr01123 141111 m,w Aroj.C,Completed
419..1
0151e Town Center Restmoma _ A TownB3IAIrg Improve Building Grounds I MAaUI MAMAS - _ come Project CPmplated
um
H1619 Town Candle Improvements-Flat Roofs-Berens A Town Building Ins,.Ins,. Building A Grounds I 20MA3044 TEE...-. - ..ww Project Completed
oe.e
H1614 Town Center-Elevator Modernization A Town Bowing Improve Building&Grounds s 201.10ATT 291113.72 0A0 cos Project Completed
H6579 Sheldmke Trails-Drain Crossin s A 22 other Conservation i WACO. 1040010 Proect Completed
owe
H2419 Environmental Systems Research l natl..IESRI)system installellnn B Info Tedwology Engineering s m.ae #.aM,W w owe Project COOPleted
M3381 Traffic Signal Replacement.Myrtle/Murray B Co...,6 PERM, Mlghway a wau4.a0 C.16,4.11.96_ 7,IX773 OOA7amj u.w Awiia Project needs funding
we.
H51OS Brush chipper_ BS 29 Vehicles 6 FoUr _ Hglway 6 wee. 116.13112.110 - ere Project COmPNted
au
H5106 Pay Loader DB 24 Vehicles&E6,$ H9lrwey i 231101.0e 24T5e1.ei r Projad Completed
TA.H51011 Chipper Box -DB 0.Hclesa Equip Hlphway i Beam • 1 awn AurctusaeomPl.-will doss
or
H610E Excavator 06 Veh2leaA Equip Highway a0A26M 0034*0 - new Project Completed
or
H6413 Nancy Lana Stone Sewer Extension DB 21 SWm+Grlrag HA la
e Highway s 1550c uew - a_ Project Completed
new
H6113 Murd Woods Enamor, DB 24 Storm Drainage Highway s comer •
och ow-, Meet Completed
owe
H5126 Highway Garage Drainagelmprovemente DB 23 Swan Drainage Highwie s MMAsaa 200A66.31i_ - awe Poled Completed
www Design development in progress.Expecting bid
_H5138 Highway Tree Garage Reconstruction 0B 22 TcwnBdlolglmprnvs Highway s I.I I6e04m 71,19.0s r WAWA 1.aO,1IPY1 cones _d0cumentstOr value engineered project In fall 2025
uwx
H5192 Brine System 0B 00 Vehicles Equip XN02201 a a.Tal.ee a, - - esa Project Completed-Needle bill VOM for their share
wee Contract awarded,conatmttion start expected in late
H5145 Weaver Street-Sidewalk Extension DB 22_Roadway 6 Highway Highway a 1An,lw,sv a 1mawe.,, eose,nr, July
row
14516S Archway-Stone Masonry(LarchorM Carden) DB 22 Roadway 6 Highway Niphry a swam.. -
nl a„r Penland Completed
115123 crosswalks 013 24 Hgkwey I 109m2s 1e4u1e - me Project Completed
M1620 WIN ACCeee Ponta A 25 Ws Technology D s H.ee202 .m - min Pranad COmpNIed
ue..e
H3177 Police Bellletit Equipment _ B Dear Police r 15rs.0 1si0.Jl - re„v -Project Completed
nee
H3177 Rifle Rated Response Shields 6 25 Other p41 au -
,eaf 2eAw.33 - owe Project Completed
new
H31TT Speed Complaint system B 00nr _ Police 1 12A0r21 uA00ar - o-•a Project Completed
a2 2025 CAPITAL PROJECT STATUS
r.w�a.awr women evamr.pa w,.ea aaar we
4 PROJECT DESCRIPTION rune re uws+ry aeww„ MEXPEICIEV
er auoorn 512u18Feve euuoe-n su.a ...,, STATUS
X7072 Recreation-F250-with snow plow A 24 Reuaat'g1 F2Ci1Aies Accrual.. s KM. ore. oeew Project Completed
H1224 Ica Rink Office Improve-HVAC4dmInILOSby _ Recreation Facilities Recreation s uxsex0s 423,um -_ Chord uwEl Project Completed
X7248 Ica Rink.Peaking l t RepavellMtd A 24 Recreation Faclllllea Recreation_, a tandem • Mawr new_ . _Project Completed
H6160 Sanitary SSW*,ImproverMMo SS Sanhary Sewer Sanitary Sewer s 8,127,721.51 0.117.72I.a - �e
ae.,e PlOjacl Completed
x1988 Rya Lake turb'rey Curtain SW 23 Wales System Wets I 1OAMaa legxww.w. Caw row Raj.Completed
H7219 Ice Rink EMS A P3 ww
.i 2oxam a,m-w ...pp Project will not be done-too expensive
- ,Closed Total _ 10.660i22.81:5 2aur13 $ 2,241,333.39
I I Grand Total 27,931,074.35 $37,065,971E74 $23,4,11,157.20 I
Town Board
August 13, 2025
Attachment B
TOWN OF MAMARONECK
2026 TENTATIVE BUDGET
2026
Project Dept Budget Categories Description Project
Budget
Zamboni-Ice Rink Garage/Recreation Vehicles&Equip Replace 2010 Zamboni for ice rink. 130,000
Radio Motor Patrol Cars Garage/Police Vehicles&Equip 3 Hybrid Ford Police Vehicles with outfitting —
230,000
Replace 2014 1 Ton Ford dump truck with a Ford F450 4 wheel drive
Dump Trucks-1 Ton Garage/Highway Vehicles&Equip with plow.The 2014 will be used for leaf/snow emergencies. 150,000
Dump Truck-6 Wheel Garage/Highway Vehicles&Equip Replace a 2005 INT'LL 7300 DUMP/SPREADER 295,000
Lawn Mower Garage/Highway Vehicles&Equip Replace a 2008 John Deere riding lawn mower for Parks Dept 55,000
Tractor Garage/Highway Vehicles&Equip Replace a 2016 John Deere tractor 52,000
Pickup Truck Garage/Highway Vehicles&Equip Replace Highway 2015 Ford F250 pickup for 75,000
Pickup Truck Garage/Highway Vehicles&Equip Replace a 2010 Ford F-1•50 for Conservation 65,000
2026 Chevy Tahoe to replace the 2013 Chevy vehicle used 24
Fire Chief Car Garage/Fire Vehicles&Equip hrs./day by the Fire Chief. 85,000
Vehicles&Equip Total 1,137,000
Painting Town Center First floor hallways.2 conference room,
Town Center-Painting Buildings&Grounds Town Buildings recreation,roof railings/soffetslstairwells,exterior railings 90,000•
The third floor bathrooms are the original to the buildings and are 40
Town Center-Third Floor years old.Tile floors are cracking and require patching,partitions are
Bathrooms(2) Buildings&Grounds Town Buildings rusted,scratched and dented. 100,000
Replace 100 year old lead glass windows;Roof is deteriorating and is
Sheldrake/Monroe Camp approximately 40 years old;Replace siding and windows that are over
Improvements Buildings&Grounds Town Buildings 25 years old. 300,000
Replace 20 year old carpets and 40 year old tile floors that have
Town Center-Flooring Buildings&Grounds Town Buildings reached the end of life that have deteriorated. 300,000
Exterior improvements at the Senior Center building is the last phase
of the required improvements.The shingles and flat roof areas that
Senior Center Exterior are over 30 years old,two doorways,eight windows and metal railings
Improvements Buildings&Grounds Town Buildings_ are included in the project. 408,000
The Highway Garage windows and front door are over 60 years old.
The windows are cracked and many cannot be open.20 new windows
Highway Garage Windows Highway Town Buildings and a new door assembly with new energy efficient models. 108,000
Highway Yard Parking Lot The Highway yard exhibits visible deterioration including cracking,
Resurfacing Highway Town Buildings potholes and failing patchwork. 95,000
Two of the highway garage doors are over 30 years,have bent rails
and rot.The pass doors cannot be used and do not close correctly.
These doors have been repaired multiple times and are a safety
hazard.This project will replace these doors with energy efficient
Highway Garage Doors Highway Town Buildings doors. 31,500
TOWN OF MAMARONECK
2026 TENTATIVE BUDGET
Project Dept Budget Categories Description 2026
Project
Budget
Town's share of taking down the defunct incinerator at the
Demolish incinerator-Tom Sanitation/Highway facility.The estimate of$1.2million is anticipated to
NOL 50%of Estimated cost Garbage Town Buildings be shared with the Village of Larchmont. 600,000
Town Buildings Total 2,032,500
The current skate rental shop in the ice rink is inadequately support by
the asphalt pavement that has experienced settlement as the site is on
a former landfill.New micro plates and grade beams will provide
additional foundation support to prevent further settlement.The project
estimate is$216,372 and$115,000 has been funded in 2025.
Ice Rink Skate rental shop Recreation Recreation Additional funding of 101,375 is needed to complete the project. 101,375
Removal of current flooring and installation of new rubber flooring in
Ice Rink-Rubber Flooring Recreation Recreation lobby are,offices,bathrooms and community room. 127,000
Repair or replace ice rink compressors.The compressors are_
years old and are reaching the end of their useful life.The tubes are
leaking and will need either a repair/replacement.The load test results
Ice Rink Compressors Recreation Recreation This is a financial placeholder to replace the ice rink compressor. 10,000
Replacement of worn and torn Ice Rink front door entry awning and
Ice Rink-Entry Awning and new one would extend over Pool Concession window to replace the
New Pool Concession Awning Recreation Recreation seasonal existing post awning. 12,000
Memorial Park Tennis Court
Reconstruction Recreation Recreation _Rehabilitation of tennis courts at Memorial Park. 96,000
Design development for the reconstruction and improvements to the
Field Reconstruction _ Recreation _Recreation Hommocks Park recreation fields. 310,000
Shade Improvements at Construction new canopy structures in conjunction with plantings to
Memorial Park Recreation Recreation improve shade coverage in the playground area. 400,000
Recreation Total 1,056,375
Traffic Signal Replacement Engineering Roads&Highway_Replacement of traffic signal at Forest Ave/Murray Ave. 690,000
Milling and repaving of various roads with 2"depth wearing course&
resetting various utility structures to grade.Selected roadways exhibit
visible deterioration including cracks,potholes,and failing temporary
Resurfacing of Roads Engineering Roads&Highway patchwork. 480,000
Town Board
August 13, 2025
Attachment B (Cont'd)
TOWN OF MAMARONECK
2026 TENTATIVE BUDGET
2026
Project Dept Budget Categories Description Project
Budget
Reconstruction of concrete sidewalks,ada ramps and resetting utility
Sidewalks and Curbs-Howell structures at Edgewood Ave,Bryson St,crosswalk at N Chatsworth,
Ave Engineering Roads&Highway and Preston/Myrtle Blvd 211,000
Decorative street light poles replacement.3 replaced fin 2025 and 5
each of next five years.They are rotting and will be replaced with
Decorative Streetlights Highway(SL) Roads&Highway fiberglass poles. 35,000
Roads&Highway Total 1,416,000
Design development of Madison/Fifth Ave,Kolbert Dr&Adrian Circle
and to advance Colonial/Homerglenn/EcholMaplewood and Cabot
Storm Sewer Improvements Engineering Storm Drainage Rd/Myrtle Blvd. 505,000
Construction of flood mitigation storm sewer improvements based on
the comprehensive drainage evaluation project.Fenimore Rd culvert
replacement,7 County Rd realignment and Old White Plains
Storm Sewer Improvements Engineering Storm Drainage improvements will begin in 2026. 2,864,000
Replacement of the deteriorated culvert crossing of Griffen Ave is
needed so that it can handle the peak water flows without flooding the
roadway,This project will be a joint project with the Village of
Culvert Replacement-Griffen Scarsdale.An application for a grant from Westchester County Flood
Ave Engineering Storm Drainage Mitigation Grant program with up to a 50%match. 287,500
Storm Drainage Total 3,656,500
Upgrade domain controllers,server switches and communications
Server Replacement IT Info Technology equipment to meet current security standards. 35,000
Laptop purchases as desktop Approximately 35 laptops to replace end of life desktops. They serve a
replacements IT Info Technology dual purpose in that they can be unplugged and used remotely. 40,000
Unifi Enterprise Cloud Enterprise cloud controller to unify and centralize our network systems
Controller IT Info Technology through Unifi. 16,000
Info Technology Total 91,000
Baldwin Ave Pump Station Design development and construction of a replacement of the Baldwin
Replacement Engineering Sanitary Sewer Ave pump station including a generator. 2,100,000
High Pressure Sewer Cleaner_ Highway-Sewer Sanitary Sewer Trailer mounted sewer jet cleaner to flush sewer lines. 45,000
Sanitary Sewer Total 2,145,000
TOWN OF MAMARONECK
2026 TENTATIVE BUDGET
Project Dept Budget Categories Description 2026
Project
Budget
Replace 30 portable radios with more modern multi-band radios to
communicate throughout the County.This is vital during mutual aid
events and major emergencies.Consequence of inaction:Officers will
be unable to communicate with Officers from many outside
jurisdictions during an emergency.
Portable Radio Upgrades Police Other Projects 160,000
The current firearms are aging and presenting a potential risk to both
the officers and the public.Replacement of 40 weapons are needed to
ensure that our officers remain proficient,well-equipment and mission
Service Weapons Police Other Projects ready. 70,000
Rifle rated response Shields _ Police Other Projects Purchase 15 rifle rated response shields for active shooter responses. 23,500
A new updated,modern ID card system will provide security features,
Identification Card System Police Other Projects store training and contact information for the department's employees. 12,000
Radio network upgrade Ambulance Other Projects Radio Network upgrade planned. 50,000
Other Projects Total 315,500
Grand Total $ 11,849,875
Town Board
August 13, 2025
Attachment C
2026 PROJECTED BOND ISSUANCE
2026 New 2026 Draft
2025 Existing Borrowing for Budget
Projects for ZvZr Budgeted @ 8/13/25 for
Org Project Bonding 362.4 BAN Projects New Projects
H1364 Rye Lake(EFC LOAN POSSIBLE) 5,763,000 5,763,000
H7125 Pool
H3411 Fire Engine* 1,534,000 1,534,000
H1402 Lead Service Line 960,400 960,400
H5145 Wseaver St Sidewalk Extension 922,100 922,100
H8553 Gardens Lake 885,000 885,000
H8610 Garbage Incinerator Demo Placeholder 513,000 513,000
H5135 Drainage 489,000 489,000
H5191 Sign Shop 330,000 330,000
H5104 Roads 200,650 200,650
H5199 Colonial Sidewalk 186,120 186,120
H5173 Curb Improvements 153,000 153,000
H6703 Sr Center 95,300 95,300
Existing Projects $ 12,031,570 $ 4,035,450 $ 7,996,120 $ -
2026 New Projects
H7271 Zamboni-Ice Rink 130,000 130,000
H5106 Dump Trucks-1 Ton 150,000 150,000
H5106 Dump Truck-6 Wheel 295,000 295,000
H5106 Lawn Mower 55,000 _ 55,000
H1614 Town Center-Third Floor Bathrooms(2) 100,000 100,E
H1614 Sheldrake/Monroe Camp Improvements 300,000 300,000
H1614 Town Center-Flooring 139,225 139,225
H6758 Senior Center Exterior Improvements 408,000 408,000
H51100 Highway Garage Windows 108,000 108,000
H51100 Highway Yard Parking Lot Resurfacing 95,000 95,000
H51100 Highway Garage Doors 35,000 35,000
H8610 Demolish incinerator-Tom/VOL 50%of Estimated cost 600,000 _ 600,000
H7224 Ice Rink-Rubber Flooring 127,000 127,000
H70101 Field Reconstruction 310,000 310,000
H7131 Shade Improvements at Memorial Park 400,000 400•000
H3361 Traffic Signal Replacement 690,000 690,000
H5104 Resurfacing of Roads 271,750 271,750
H5173 Sidewalks and Curbs 211,000 211,000
H5135 Storm Sewer Improvements 505,000 505,000
H51111 Culvert Replacement-Griffen Ave 287,500 287,500
H8123 Baldwin Ave Pump Station Replacement 2,100,000 2,100,000
2026 Subtotal 7,317,475 - - 7,317,475
Grand Total $ 19,349,045 $ 4,035,450 $ 7,996,120 $ 7,317,475
*Fire engine requires a bond resolution but will be bonded in 4 years based on projected delivery dates
NOTE:The current construction estimate for the splash pad replacement is$1.2m of which$1.0 will require bonding in 2027.
Town Board
August 13, 2025
Attachment D
SURVEY REPORT
,.- Outdoor Hommocks Pool Facility Survey
April 7,2025- May 7,2025
..
‘„,i _ TOWN OF
111 MAMARONECK
• aNDLO1., NEW Y O R K
i
Apo
SUMMARY
Complete Survey Submissions - 1,222
Submissions ?1 Response - 1,406 "
Completion Rate - 71.46%
1---*')' 7144)
Town Board
August 13, 2025
Attachment D (Cont'd)
29.87% Current users (420)
Do they want renovations,even if it eosts more?
' '"•,r
o : 4041%. r
,,, .
..„.. .4. 0.
. ...e,. .r iiie li .Atz ir. rs,.
R 50.36% Past users (708)
Would improvements bring them back?
otal
19.77% Non-users (278)
Would they start using it if major improvements were made?
Respondent -
1406
Current Users
Approximately 66%of Respondents indicated that if the pool were renovated
current users stated that their pool usage would be most and expanded,nearly 71%
they would be willing to pay influenced by a larger pool area of users reported that
an increased annual (67%) and a greater variety of their current usage would
membership fee for depth options 55% .
( ) increase.
renovations ($100 or more).
it
Town Board
August 13, 2025
Attachment D (Cont'd)
Past Users
The primary reason respondents no
longer use the facility is its outdated
` 01 condition(49%1,followed closely by a
lack of amenities(48%)such as shade
:, — and seating.
68%of respondents indicated a preference
for a larger pool area,followed by a desire 02
for varied depth options(49%).
f
lir
69%of respondents said renovations would
1 !" 03 Igkely lead them to join,with 40%of that
group saying they are very likely to become
members.
Non-users
T '' ` `" • 46%of respondents indicated that their
- primary reservations about using the pool
's are the lack of amenities and limited
space/overcrowding,followed by concerns
about outdated facilities(37%).
s
• Most Desired Pool Renovations
o Larger Pool Area-67%
a Additional Seating-57%
�,. - y Improved Water Features(e.g.,slides,
• . fountains)-49%
,.r 4,0`
p�-� •• Approximately 70%of non-user survey
`� respondents stated that renovations would
likely influence their decision to become a
member.
Town Board
August 13, 2025
Attachment D (Cont'd)
TOWN OF
?~ '9-. MAMARONECK
NEW YORK
COMPETITIVE
ANALYSIS
All respondents,whether current users,past
user or non-users,were asked the same
question:What improvements would make
you more likely to use the Outdoor
Hommocks Pool Facility?
The graph on the following page shows the6106151
specific improvements they identified.
COMPETITIVE ANALYSIS
Current Users • Past Users Non-users
Larger Pool Area 11.11111.111111.111.111.111111111 -
Additional Seating 806
-
519
Expanded Hours of Operation
,r 452
More Parking 83
E Better Water Features(slides,fountains,etc.)
522
seperate Area for Kids and Adults
369
Different Depths
a 582
More Open Green Space 246
Larger Toddler Pool11.11111 168
Additional Shaded Areas
526
Splash Pad for Kids 300
Lap Lanes 439
0 100 200 300 400 500 600 700 800 900
Total Number of Votes
Town Board
August 13, 2025
Attachment D (Cont'd)
TOWN OF
2.
M
,±�Y IIIIIAARONECK ,.
xNEW t YORK .,�..
.� _
n�� .rs - / fir ��
COMMENTS _
27%of respondents provided additional written ..0
feedback.The most frequently discussed topic was _-----�•
ool facility improvements,with a strong emphasis `
p
_ -
on pool depth. - F;
Within the pool facilities improvement category,
the Scarsdale Pool Complex was mentioned in
roughly 50 comments as a model for the type of -
upgrades respondents would like to see in our q.
community. `` '
A repeated theme among these comments was
that older children often outgrow the current pool
ili
design.
FINAL SUMMARY
Sentiment Analysis:
Scarsdale's municipal pool was frequently
highlighted as a model for what residents hope to
In all three focus areas,a majority of survey see locally.
responses indicate that their usage would likely
Many respondents noted the indoor pool is less
increase with targeted renovations.
appealing during summer months, preferring
Top Priorities Identified: outdoor options.
1. Larger pool area
Several more modern and recently updated
2. Different depth options
, facilities in neighboring communities were
3. Improved water features(slides,fountains,
mentioned as alternatives drawing local families
4. Expanded outdoor summer features(shade away.
and seating)
Residents want an outdoor facility that:
• Grows with families
• Serves a wider range of ages and interests
• Fosters a stronger sense of community within
the Town of Mamaroneck
Town Board
August 13, 2025
Attachment E
TOWN OF MAMARONECK FIRE DEPARTMENT
OFFICE OF THE `
CHIEF /�/` Headquarters
205 WEAVER STREET
LARCH MONT,NEW YORK 10538
WEAVER 834-2100 EMERGENCY
834-2101-NON EMERGENCY
834-2438 CHIEFS OFFICE
STREET 834-0922-FAX
WWW.TMFD.ORG
ZatanimeoN
To: Board of Fire Commissioners
From: Chief Alexander Rapp
Date: August 04,2025
Re: Fire Report for the Month of July 2025
The following report outlines response to calls made during the month of July 2025. It summarizes the
nature,the number of personnel responding and the total time spent.
I have also attached a report showing a further breakdown of these alarms.
Alarm Type Number
Generals 37
Minors 31
Stills 9
Out of Town(Mutual Aid) 1
EMS 41
Drills 6
TOTAL 125
Total number of personnel responding: 968
Total time working: 66 hours and 12 minutes
Respectfully Submi d,
Chef Al ande pp
Town Board
August 13, 2025
Attachment E (Cont'd)
Incident Type Count Report
Date Ranee: From 7/1/2025 To 7/31/2025
Selected Station(s):All
Incident
Type Description Count
Station: EMS
311 -Medical assist,assist EMS crew 26 21.85%
321 -EMS call,excluding vehicle accident with injury 16 13.45%
Total-Rescue&Emergency Medical Service Incidents 42 100.00%
Total for Station 42 35.29%
Station: HO
100-Fire,other 1 0.84%
131 -Passenger vehicle fire 1 0.84%
Total-Fires 2 2.94%
322F-Vehicle accident with injuries 2 1.68%
323F-Motor vehicle/pedestrian accident(MV Ped) 2 1.68%
324F-Motor vehicle accident with no injuries 1 0.84%
331F-Lock-in(if lock out,use 511 ) 1 0.84%
350F-Extrication,rescue,other 1 0.84%
Total-Rescue&Emergency Medical Service Incidents 7 10.29%
400-Hazardous condition,other I 0.84%
412-Gas leak(natural gas or LPG) 2.52%
440-Electrical wiring/equipment problem,other 4 3.36%
441 -Heat from short circuit(wiring),defective/worn 1 0.84%
445-Arcing,shorted electrical equipment 1 0.84%
Total-Hazardous Conditions(No fire) 10 14.71%
520-Water problem,other 2 1.68%
531 -Smoke or odor removal 1 0.84%
551 -Assist police or other governmental agency 1 0.84%
555-Defective elevator,no occupants 2 1.68%
Total-Service Call 6 8.82%
600-Good intent call,other 2 1.68%
611 -Dispatched&cancelled en route 1 0.84%
622-No incident found on arrival at dispatch address 4 3.36%
651 -Smoke scare,odor of smoke 5 4.20%
Total-Good Intent Call 12 17.65%
700-False alarm or false call,other 6 5.04%
714-Central station,malicious false alarm 1 0.84%
735-Alarm system sounded due to malfunction 1 0.84%
736-CO detector activation due to malfunction 3 2.52%
740-Unintentional transmission of alarm,other 2 1.68%
743-Smoke detector activation,no fire-unintentional 4 3.36%
744-Detector activation,no fire-unintentional 2 1.68%
745-Alarm system sounded,no fire-unintentional 11 9.24%
746-Carbon monoxide detector activation,no CO 1 0.84%
Total-Fals Alarm&False Call 31 45.59%
Page I of 2 Primed 08/04/2025 18:34:00
Town Board
August 13, 2025
Attachment E (Cont'd)
Incident
Type Description Count
Total for Station 68 57.14%
Station: STIL
321 -EMS call,excluding vehicle accident with injury 3 2.52%
322F-Vehicle accident with injuries 1 0.84%
Total-Rescue&Emergency Medical Service Incidents 4 44.44%
571 -Cover assignment,standby,moveup 2 1.68%
Total-Service Call 2 22.22%
611 -Dispatched&cancelled en route I 0.84%
Total-Good Intent Call 1 11.11%
900-Special type of incident,other 2 1.68%
Total-Special Incident Type 2 22.22%
Total for Station 9 7.56%
119 100.00%
Page 2 of 2 Printed 08/04/2025 18.34:10