Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TA-22-01 New Harmon Drive Sidewalk Improvements 2/4/2022
Bid Tabulation Sheet TA-22-01 New Harmon Drive Sidewalk Improvements Bid Opening Date: 02/04/2022 ITEM No. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID W202.1903 Remove Existing Curbing, Pipe LF 1,200 15.85$ 19,020.00$ 3.00$ 3,600.00$ 9.00$ 10,800.00$ 6.00$ 7,200.00$ 10.84$ 13,008.00$ 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL C.Y. 266 109.85$ 29,220.10$ 75.00$ 19,950.00$ 75.00$ 19,950.00$ 85.00$ 22,610.00$ 90.00$ 23,940.00$ W206.0101 ROCK EXCAVATION C.Y. 10 75.00$ 750.00$ 90.00$ 900.00$ 10.00$ 100.00$ 25.00$ 250.00$ 450.00$ 4,500.00$ 206.05 TEST PIT EXCAVATION EA. 2 5,000.00$ 10,000.00$ 10.00$ 20.00$ 200.00$ 400.00$ 500.00$ 1,000.00$ 3,000.00$ 6,000.00$ 605.16010008 NON-PERFORATED PVC 4" DIA PIPE LF 40 5.75$ 230.00$ 45.00$ 1,800.00$ 50.00$ 2,000.00$ 45.00$ 1,800.00$ 37.50$ 1,500.00$ 608.0101 CONCRETE SIDEWALKS AND DRIVEWAYS C.Y. 95 432.75$ 41,111.25$ 955.00$ 90,725.00$ 1,000.00$ 95,000.00$ 850.00$ 80,750.00$ 1,100.00$ 104,500.00$ 608.020102 HOT MIX ASPHALT (HMA) SIDEWALKS, DRIVEWAYS TON 70 189.00$ 13,230.00$ 225.00$ 15,750.00$ 200.00$ 14,000.00$ 185.00$ 12,950.00$ 223.00$ 15,610.00$ 608.21 EMBEDDED DETECTABLE WARNING UNITS S.Y. 5 127.85$ 639.25$ 150.00$ 750.00$ 65.00$ 325.00$ 500.00$ 2,500.00$ 300.00$ 1,500.00$ W608.41 REMOVE AND RESET PAVERS SF 22 42.75$ 940.50$ 25.00$ 550.00$ 40.00$ 880.00$ 20.00$ 440.00$ 35.00$ 770.00$ 609.04 CAST-IN-PLACE CONCRETE CURB (AS DETAILED) L.F. 1,210 33.72$ 40,801.20$ 33.50$ 40,535.00$ 35.00$ 42,350.00$ 35.00$ 42,350.00$ 54.26$ 65,654.60$ 610.1101 MULCH - WOOD CHIPS AND STREDDED BARK C.Y. 2 200.00$ 400.00$ 75.00$ 150.00$ 80.00$ 160.00$ 65.00$ 130.00$ 150.00$ 300.00$ 610.1403 TOPSOIL - LAWNS C.Y. 39 82.50$ 3,217.50$ 65.00$ 2,535.00$ 60.00$ 2,340.00$ 60.00$ 2,340.00$ 94.00$ 3,666.00$ W610.1602 TURF ESTABLISHMENT - LAWN AND MOWING/WATERING S.Y. 345 9.00$ 3,105.00$ 9.00$ 3,105.00$ 5.00$ 1,725.00$ 3.00$ 1,035.00$ 5.80$ 2,001.00$ 619.01 BASIC WORK ZONE TRAFFIC CONTROL L.S. 1 8,500.00$ 8,500.00$ 10,000.00$ 10,000.00$ 20,000.00$ 20,000.00$ 85,000.00$ 85,000.00$ 19,200.00$ 19,200.00$ 619.080102 REMOVE PAVEMENT MARKINGS STRIPES - EPOXY PAINT L.F. 100 5.00$ 500.00$ 2.50$ 250.00$ 7.00$ 700.00$ 6.50$ 650.00$ 5.00$ 500.00$ 623.12 CRUSHED STONE (IN-PLACE MEASURE) C.Y. 125 78.62$ 9,827.50$ 65.00$ 8,125.00$ 75.00$ 9,375.00$ 80.00$ 10,000.00$ 103.00$ 12,875.00$ 627.50140008 CUTTING PAVEMENT L.F. 2,600 3.25$ 8,450.00$ 8.00$ 20,800.00$ 5.00$ 13,000.00$ 5.00$ 13,000.00$ 4.00$ 10,400.00$ 635.0103 CLEANING AND PREPARATION OF PAVEMENT SURFACES - LINES L.F. 550 11.18$ 6,149.00$ 3.90$ 2,145.00$ 1.00$ 550.00$ 1.50$ 825.00$ 3.64$ 2,002.00$ 645.5101 GROUND MOUNTED SIGN PANELS W/O Z BARS S.F. 19 50.82$ 965.58$ 350.00$ 6,650.00$ 60.00$ 1,140.00$ 40.00$ 760.00$ 85.00$ 1,615.00$ 645.81 TYPE A SIGN POSTS EA. 3 125.00$ 375.00$ 255.00$ 765.00$ 200.00$ 600.00$ 250.00$ 750.00$ 350.00$ 1,050.00$ 645.81020003 RETROREFLECTIVE SIGN POST STRIP EA. 3 78.00$ 234.00$ 175.00$ 525.00$ 120.00$ 360.00$ 200.00$ 600.00$ 300.00$ 900.00$ 647.61 REMOVE SIGN EA. 3 50.00$ 150.00$ 150.00$ 450.00$ 100.00$ 300.00$ 150.00$ 450.00$ 333.34$ 1,000.02$ W660.01R REPLACE WATER VALVE STEM & COVER (MATERIALS SUPPLIED BY TOWN AND WJWW)EA. 4 225.75$ 903.00$ 350.00$ 1,400.00$ 500.00$ 2,000.00$ 400.00$ 1,600.00$ 62.50$ 250.00$ W660.30 ALTERING GAS VALVE BOXES EA. 8 125.00$ 1,000.00$ 175.00$ 1,400.00$ 200.00$ 1,600.00$ 100.00$ 800.00$ 250.00$ 2,000.00$ 685.11 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES - 20 MILS L.F. 550 3.75$ 2,062.50$ 5.00$ 2,750.00$ 6.50$ 3,575.00$ 8.50$ 4,675.00$ 4.00$ 2,200.00$ W800 MISCELLANEOUS ADDITIONAL WORK F.L.S. 1 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ Total:206,781.38$ Total:240,630.00$ Total:248,230.00$ Total:299,465.00$ Total:301,941.62$ Contractor's Bid Price 206,543.78$ Contractors Bid Price 305,541.62$ Woodland Manor, LLCWND Construction Vernon Hills Peter J. Landi, Inc. Paladino Concrete Page 1 of 2 Bid Tabulation Sheet TA-22-01 New Harmon Drive Sidewalk Improvements Bid Opening Date: 02/04/2022 ITEM No. DESCRIPTION UNIT QUANTITY W202.1903 Remove Existing Curbing, Pipe LF 1,200 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL C.Y. 266 W206.0101 ROCK EXCAVATION C.Y. 10 206.05 TEST PIT EXCAVATION EA. 2 605.16010008 NON-PERFORATED PVC 4" DIA PIPE LF 40 608.0101 CONCRETE SIDEWALKS AND DRIVEWAYS C.Y. 95 608.020102 HOT MIX ASPHALT (HMA) SIDEWALKS, DRIVEWAYS TON 70 608.21 EMBEDDED DETECTABLE WARNING UNITS S.Y. 5 W608.41 REMOVE AND RESET PAVERS SF 22 609.04 CAST-IN-PLACE CONCRETE CURB (AS DETAILED) L.F. 1,210 610.1101 MULCH - WOOD CHIPS AND STREDDED BARK C.Y. 2 610.1403 TOPSOIL - LAWNS C.Y. 39 W610.1602 TURF ESTABLISHMENT - LAWN AND MOWING/WATERING S.Y. 345 619.01 BASIC WORK ZONE TRAFFIC CONTROL L.S. 1 619.080102 REMOVE PAVEMENT MARKINGS STRIPES - EPOXY PAINT L.F. 100 623.12 CRUSHED STONE (IN-PLACE MEASURE) C.Y. 125 627.50140008 CUTTING PAVEMENT L.F. 2,600 635.0103 CLEANING AND PREPARATION OF PAVEMENT SURFACES - LINES L.F. 550 645.5101 GROUND MOUNTED SIGN PANELS W/O Z BARS S.F. 19 645.81 TYPE A SIGN POSTS EA. 3 645.81020003 RETROREFLECTIVE SIGN POST STRIP EA. 3 647.61 REMOVE SIGN EA. 3 W660.01R REPLACE WATER VALVE STEM & COVER (MATERIALS SUPPLIED BY TOWN AND WJWW)EA. 4 W660.30 ALTERING GAS VALVE BOXES EA. 8 685.11 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES - 20 MILS L.F. 550 W800 MISCELLANEOUS ADDITIONAL WORK F.L.S. 1 UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID 15.00$ 18,000.00$ 11.00$ 13,200.00$ 120.00$ 31,920.00$ 100.00$ 26,600.00$ 400.00$ 4,000.00$ 90.00$ 900.00$ 500.00$ 1,000.00$ 1,000.00$ 2,000.00$ 30.00$ 1,200.00$ 50.00$ 2,000.00$ 670.00$ 63,650.00$ 1,250.00$ 118,750.00$ 275.00$ 19,250.00$ 170.00$ 11,900.00$ 350.00$ 1,750.00$ 325.00$ 1,625.00$ 50.00$ 1,100.00$ 65.00$ 1,430.00$ 42.00$ 50,820.00$ 90.00$ 108,900.00$ 150.00$ 300.00$ 90.00$ 180.00$ 75.00$ 2,925.00$ 95.00$ 3,705.00$ 18.00$ 6,210.00$ 20.00$ 6,900.00$ 70,180.00$ 70,180.00$ 10,000.00$ 10,000.00$ 8.00$ 800.00$ 6.00$ 600.00$ 90.00$ 11,250.00$ 90.00$ 11,250.00$ 3.00$ 7,800.00$ 5.00$ 13,000.00$ 3.00$ 1,650.00$ 5.00$ 2,750.00$ 150.00$ 2,850.00$ 225.00$ 4,275.00$ 200.00$ 600.00$ 320.00$ 960.00$ 100.00$ 300.00$ 350.00$ 1,050.00$ 150.00$ 450.00$ 350.00$ 1,050.00$ 300.00$ 1,200.00$ 350.00$ 1,400.00$ 100.00$ 800.00$ 375.00$ 3,000.00$ 5.00$ 2,750.00$ 5.00$ 2,750.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ Total:307,755.00$ Total:355,175.00$ Con Tech MTS Infrastructure Page 2 of 2