HomeMy WebLinkAboutTA-22-05 Senior Center Parking Lot 3/25/2022Bid Tabulation Sheet TA -22-05 Bid Opening Date: 3/25/2022 ITEM No. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID W202.1901 Small Structures Removals EA. 3 150.00$ 450.00$ 635.00$ 1,905.00$ 1,266.66$ 3,799.98$ W202.1902 Large Structures Removals EA. 1 2,500.00$ 2,500.00$ 1,250.00$ 1,250.00$ 3,500.00$ 3,500.00$ 203.02 Unclassified Excavation and Disposal C.Y. 1005 85.00$ 85,425.00$ 100.00$ 100,500.00$ 100.00$ 100,500.00$ 203.03 Embankment in Place C.Y. 100 45.00$ 4,500.00$ 50.00$ 5,000.00$ 95.00$ 9,500.00$ 203.07 Select Granular Fill C.Y. 45 90.00$ 4,050.00$ 50.00$ 2,250.00$ 90.00$ 4,050.00$ W206.0101 Rock Excavation ($90 min, $150 max) C.Y. 100 100.00$ 10,000.00$ 150.00$ 15,000.00$ 200.00$ 20,000.00$ 206.05 Test Pit Excavation EA. 2 200.00$ 400.00$ 1,200.00$ 2,400.00$ 3,000.00$ 6,000.00$ 207.21 Geotextile Separation S.Y. 761 5.00$ 3,805.00$ 3.50$ 2,663.50$ 4.00$ 3,044.00$ 209.13 Silt Fence -Temporary L.F. 500 8.50$ 4,250.00$ 8.00$ 4,000.00$ 4.00$ 2,000.00$ W209.1703 Drainage Structure Inlet Protection, Prefabricated - Temporary EA. 5 200.00$ 1,000.00$ 200.00$ 1,000.00$ 250.00$ 1,250.00$ 209.22 Construction Entrance/Exit S.Y. 85 45.00$ 3,825.00$ 100.00$ 8,500.00$ 65.00$ 5,525.00$ 209.190201 Rolled Erosion Control Product, Class II Type B Intermediate S.Y. 975 6.50$ 6,337.50$ 5.00$ 4,875.00$ 6.00$ 5,850.00$ 304.11 Subbase Course, Type 1 C.Y. 263 75.00$ 19,725.00$ 100.00$ 26,300.00$ 90.00$ 23,670.00$ 420.01190201 Binder Course Porous Asphalt Pavement F9 TN. 100 175.00$ 17,500.00$ 250.00$ 25,000.00$ 250.00$ 25,000.00$ 420.10130201 Top Course Porous Asphalt Pavment with Mineral Fiber F3 TN. 200 275.00$ 55,000.00$ 180.00$ 36,000.00$ 380.00$ 76,000.00$ 560.05 Rubble Stone Masonry C.F. 3 170.00$ 510.00$ 600.00$ 1,800.00$ 250.00$ 750.00$ 603.9815 15" Dia. L.F. 25 175.00$ 4,375.00$ 75.00$ 1,875.00$ 75.00$ 1,875.00$ W604.0201 Furnish and Install New Drain Inlet with Concrete Collar EA. 4 3,500.00$ 14,000.00$ 4,000.00$ 16,000.00$ 1,500.00$ 6,000.00$ W604.0202 Furnish and Install New Infiltration Basin EA. 1 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 6,000.00$ 6,000.00$ W605.0502 Roof Leader Outlet EA. 5 350.00$ 1,750.00$ 210.00$ 1,050.00$ 300.00$ 1,500.00$ 605.16010008 Non Perforated PVC Pipe L.F. 38 40.00$ 1,520.00$ 70.00$ 2,660.00$ 65.00$ 2,470.00$ 608.0101 Concrete Sidewalks & Driveways C.Y. 36 1,000.00$ 36,000.00$ 1,000.00$ 36,000.00$ 950.00$ 34,200.00$ 608.020102 Hot Mix Asphalt (HMA) Sidewalks, Driveways Ton 314 175.00$ 54,950.00$ 125.00$ 39,250.00$ 220.00$ 69,080.00$ 608.21 Embedded Detectable Warning Units S.Y. 4 300.00$ 1,200.00$ 225.00$ 900.00$ 200.00$ 800.00$ 609.04 Cast-in-Place Concrete Curb (As Detailed) L.F. 804 35.00$ 28,140.00$ 39.00$ 31,356.00$ 48.00$ 38,592.00$ 610.1101 Mulch for Planting Type A,B & D - Wood Chips and Shredded Bark C.Y. 14 85.00$ 1,190.00$ 80.00$ 1,120.00$ 80.00$ 1,120.00$ 610.1403 Topsoil - Lawn C.Y. 110 60.00$ 6,600.00$ 95.00$ 10,450.00$ 85.00$ 9,350.00$ 610.1602 Turf Establishment - Lawns S.Y. 1000 6.00$ 6,000.00$ 5.00$ 5,000.00$ 13.00$ 13,000.00$ 614.060303 Tree Removal Over 12" to 18" at Breast Height EA. 2 1,500.00$ 3,000.00$ 3,600.00$ 7,200.00$ 1,800.00$ 3,600.00$ W614.0804 Concrete Wheel Stop EA. 13 200.00$ 2,600.00$ 215.00$ 2,795.00$ 800.00$ 10,400.00$ W619.6071 Furnish and Maintain Temporary Construction Fence LF. 225 12.00$ 2,700.00$ 26.00$ 5,850.00$ 6.00$ 1,350.00$ 620.03 Stone Filling (Light) C.Y. 3 90.00$ 270.00$ 290.00$ 870.00$ 80.00$ 240.00$ 623.12 Crushed Stone (In Place Measure) C.Y. 396 90.00$ 35,640.00$ 100.00$ 39,600.00$ 90.00$ 35,640.00$ 625.01 Survey Operations L.S. 1 17,000.00$ 17,000.00$ 82,500.00$ 82,500.00$ 25,000.00$ 25,000.00$ 627.50140008 Cutting Pavement L.F. 100 6.00$ 600.00$ 6.00$ 600.00$ 6.00$ 600.00$ W640.0502 Blue Epoxy Reflectorized Pavement Stripes - 20 mils L.F. 150 6.00$ 900.00$ 3.00$ 450.00$ 5.00$ 750.00$ W640.0602 Blue Epoxy Reflectorized Pavement Symbols - 20 mils EA. 2 300.00$ 600.00$ 270.00$ 540.00$ 1,200.00$ 2,400.00$ 645.5101 Ground Mounted Sign Panels without Z-bars S.F. 5 60.00$ 300.00$ 430.00$ 2,150.00$ 45.00$ 225.00$ 645.81 Type A Sign Posts EA. 7 250.00$ 1,750.00$ 690.00$ 4,830.00$ 260.00$ 1,820.00$ W660 Utility Location & Markout L.S. 1 1,500.00$ 1,500.00$ 1,800.00$ 1,800.00$ 1,300.00$ 1,300.00$ 685.11 White Epoxy Reflectorized Pavement Stripes 20 mils L.F.670 5.00$ 3,350.00$ 3.00$ 2,010.00$ 3.00$ 2,010.00$ Subtotal 450,212.50$ 540,299.50$ 559,760.98$ -$ -$ -$ ADD ALTERNATE A - NEW RAMP -$ -$ -$ 203.02 Unclassified Excavation and Disposal C.Y. 14 80.00$ 1,120.00$ 170.00$ 2,380.00$ 90.00$ 1,260.00$ 203.07 Select Granular Fill C.Y. 15 85.00$ 1,275.00$ 111.00$ 1,665.00$ 85.00$ 1,275.00$ 555.0105 Concrete for Structure, Class A C.Y. 11 2,500.00$ 27,500.00$ 1,800.00$ 19,800.00$ 3,500.00$ 38,500.00$ 556.0202 Epoxy-Coated Bar Reinforcement for Structures L.B. 900 10.00$ 9,000.00$ 4.00$ 3,600.00$ 8.00$ 7,200.00$ W607.7 Furnish and Install Aluminum Handrail L.F. 60 330.00$ 19,800.00$ 473.00$ 28,380.00$ 134.00$ 8,040.00$ 623.12 Crushed Stone (In Place Measure) C.Y.1 100.00$ 100.00$ 200.00$ 200.00$ 90.00$ 90.00$ Subtotal 58,795.00$ 56,025.00$ 56,365.00$ -$ -$ -$ Peter J. Landi, Inc. ELQ Woodland Manor Page 1 of 4 Page 10 of 81 Bid Tabulation Sheet TA -22-05 Bid Opening Date: 3/25/2022 ITEM No. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID Peter J. Landi, Inc. ELQ Woodland Manor ADD ALTERNATE B - TIMBER GUIDE RAIL -$ -$ -$ 203.02 Unclassified Excavation and Disposal C.Y. 19 80.00$ 1,520.00$ 76.00$ 1,444.00$ 90.00$ 1,710.00$ 555.0105 Concrete for Structure, Class A C.Y. 3 800.00$ 2,400.00$ 860.00$ 2,580.00$ 350.00$ 1,050.00$ W606.9505 Timber Guide Rail L.F. 168 100.00$ 16,800.00$ 95.00$ 15,960.00$ 89.00$ 14,952.00$ 623.12 Crushed Stone (In Place Measure) C.Y.1 85.00$ 85.00$ 70.00$ 70.00$ 95.00$ 95.00$ Subtotal 20,805.00$ 20,054.00$ 17,807.00$ -$ -$ -$ ADD ALTERNATE C - PLANTS -$ -$ -$ 611.0181 Planting - Major Deciduous Trees - 3 1/2" Claiper, B&B EA. 3 900.00$ 2,700.00$ 1,190.00$ 3,570.00$ 1,200.00$ 3,600.00$ 611.0211 Planting - Minor Deciduous Trees EA. 4 135.00$ 540.00$ 788.00$ 3,152.00$ 1,500.00$ 6,000.00$ 611.0381 Planting - Coniferous Trees - 8' height, B&B EA. 15 500.00$ 7,500.00$ 683.00$ 10,245.00$ 1,500.00$ 22,500.00$ 611.0442 Planting - Deciduous Shrubs - 2 foot height/spread EA. 47 100.00$ 4,700.00$ 840.00$ 39,480.00$ 650.00$ 30,550.00$ 611.0452 Planting - Deciduous Shrubs - 3 foot height/spread EA. 9 110.00$ 990.00$ 112.00$ 1,008.00$ 800.00$ 7,200.00$ 611.0711 Herbaceous Plants EA. 7 100.00$ 700.00$ 49.00$ 343.00$ 450.00$ 3,150.00$ W611.1701 Irrigation Bag EA.7 150.00$ 1,050.00$ 35.00$ 245.00$ 95.00$ 665.00$ Subtotal 18,180.00$ 58,043.00$ 73,665.00$ ADD ALTERNATE D - NEW ASPHALT PATH -$ -$ -$ 203.02 Unclassified Excavation and Disposal C.Y. 14 85.00$ 1,190.00$ 150.00$ 2,100.00$ 90.00$ 1,260.00$ 304.11 Subbase Course, Type 1 C.Y. 10 85.00$ 850.00$ 100.00$ 1,000.00$ 85.00$ 850.00$ 608.020102 Hot Mix Asphalt (HMA) Sidewalks, Driveways Ton 20 200.00$ 4,000.00$ 195.00$ 3,900.00$ 220.00$ 4,400.00$ Subtotal 6,040.00$ 7,000.00$ 6,510.00$ -$ -$ -$ W800 Miscellaneous Additional Work F.L.S. 1 1 45,000.00$ 1 45,000.00$ 1 45,000.00$ W851 Testing of Materials F.L.S. 1 1 5,000.00$ 1 5,000.00$ 1 5,000.00$ Base Bid Base Bid 500,212.50$ Base Bid 590,299.50$ Base Bid 609,760.98$ -$ -$ -$ Base Bid +Alt A 559,007.50$ Base Bid +Alt A 646,324.50$ Base Bid +Alt A 666,125.98$ Base Bid + Alt A,B 579,812.50$ Base Bid + Alt A,B 666,378.50$ Base Bid + Alt A,B 683,932.98$ Base Bid + Alt A,B,C 597,992.50$ Base Bid + Alt A,B,C 724,421.50$ Base Bid + Alt A,B,C 757,597.98$ Total 604,032.50$ Total 731,421.50$ Total 764,107.98$ Page 2 of 4 Page 11 of 81 Bid Tabulation Sheet TA -22-05 Bid Opening Date: 3/25/2022 ITEM No. DESCRIPTION UNIT QUANTITY W202.1901 Small Structures Removals EA. 3 W202.1902 Large Structures Removals EA. 1 203.02 Unclassified Excavation and Disposal C.Y. 1005 203.03 Embankment in Place C.Y. 100 203.07 Select Granular Fill C.Y. 45 W206.0101 Rock Excavation ($90 min, $150 max) C.Y. 100 206.05 Test Pit Excavation EA. 2 207.21 Geotextile Separation S.Y. 761 209.13 Silt Fence -Temporary L.F. 500 W209.1703 Drainage Structure Inlet Protection, Prefabricated - Temporary EA. 5 209.22 Construction Entrance/Exit S.Y. 85 209.190201 Rolled Erosion Control Product, Class II Type B Intermediate S.Y. 975 304.11 Subbase Course, Type 1 C.Y. 263 420.01190201 Binder Course Porous Asphalt Pavement F9 TN. 100 420.10130201 Top Course Porous Asphalt Pavment with Mineral Fiber F3 TN. 200 560.05 Rubble Stone Masonry C.F. 3 603.9815 15" Dia. L.F. 25 W604.0201 Furnish and Install New Drain Inlet with Concrete Collar EA. 4 W604.0202 Furnish and Install New Infiltration Basin EA. 1 W605.0502 Roof Leader Outlet EA. 5 605.16010008 Non Perforated PVC Pipe L.F. 38 608.0101 Concrete Sidewalks & Driveways C.Y. 36 608.020102 Hot Mix Asphalt (HMA) Sidewalks, Driveways Ton 314 608.21 Embedded Detectable Warning Units S.Y. 4 609.04 Cast-in-Place Concrete Curb (As Detailed) L.F. 804 610.1101 Mulch for Planting Type A,B & D - Wood Chips and Shredded Bark C.Y. 14 610.1403 Topsoil - Lawn C.Y. 110 610.1602 Turf Establishment - Lawns S.Y. 1000 614.060303 Tree Removal Over 12" to 18" at Breast Height EA. 2 W614.0804 Concrete Wheel Stop EA. 13 W619.6071 Furnish and Maintain Temporary Construction Fence LF. 225 620.03 Stone Filling (Light) C.Y. 3 623.12 Crushed Stone (In Place Measure) C.Y. 396 625.01 Survey Operations L.S. 1 627.50140008 Cutting Pavement L.F. 100 W640.0502 Blue Epoxy Reflectorized Pavement Stripes - 20 mils L.F. 150 W640.0602 Blue Epoxy Reflectorized Pavement Symbols - 20 mils EA. 2 645.5101 Ground Mounted Sign Panels without Z-bars S.F. 5 645.81 Type A Sign Posts EA. 7 W660 Utility Location & Markout L.S. 1 685.11 White Epoxy Reflectorized Pavement Stripes 20 mils L.F.670 Subtotal ADD ALTERNATE A - NEW RAMP 203.02 Unclassified Excavation and Disposal C.Y. 14 203.07 Select Granular Fill C.Y. 15 555.0105 Concrete for Structure, Class A C.Y. 11 556.0202 Epoxy-Coated Bar Reinforcement for Structures L.B. 900 W607.7 Furnish and Install Aluminum Handrail L.F. 60 623.12 Crushed Stone (In Place Measure) C.Y.1 Subtotal UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID 2,500.00$ 7,500.00$ 2,200.00$ 6,600.00$ 3,000.00$ 9,000.00$ 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 4,500.00$ 4,500.00$ 115.00$ 115,575.00$ 150.00$ 150,750.00$ 150.00$ 150,750.00$ 110.00$ 11,000.00$ 80.00$ 8,000.00$ 175.00$ 17,500.00$ 95.00$ 4,275.00$ 68.00$ 3,060.00$ 165.00$ 7,425.00$ 150.00$ 15,000.00$ 150.00$ 15,000.00$ 150.00$ 15,000.00$ 500.00$ 1,000.00$ 5,000.00$ 10,000.00$ 4,000.00$ 8,000.00$ 6.00$ 4,566.00$ 8.00$ 6,088.00$ 30.00$ 22,830.00$ 6.00$ 3,000.00$ 10.00$ 5,000.00$ 15.00$ 7,500.00$ 250.00$ 1,250.00$ 800.00$ 4,000.00$ 350.00$ 1,750.00$ 118.00$ 10,030.00$ 125.00$ 10,625.00$ 68.00$ 5,780.00$ 7.50$ 7,312.50$ 12.00$ 11,700.00$ 25.00$ 24,375.00$ 125.00$ 32,875.00$ 60.00$ 15,780.00$ 125.00$ 32,875.00$ 245.00$ 24,500.00$ 258.50$ 25,850.00$ 275.00$ 27,500.00$ 240.00$ 48,000.00$ 359.70$ 71,940.00$ 400.00$ 80,000.00$ 750.00$ 2,250.00$ 1,000.00$ 3,000.00$ 2,500.00$ 7,500.00$ 90.00$ 2,250.00$ 125.00$ 3,125.00$ 180.00$ 4,500.00$ 4,900.00$ 19,600.00$ 2,000.00$ 8,000.00$ 8,500.00$ 34,000.00$ 7,500.00$ 7,500.00$ 6,500.00$ 6,500.00$ 7,000.00$ 7,000.00$ 300.00$ 1,500.00$ 1,000.00$ 5,000.00$ 1,000.00$ 5,000.00$ 45.00$ 1,710.00$ 150.00$ 5,700.00$ 100.00$ 3,800.00$ 950.00$ 34,200.00$ 750.00$ 27,000.00$ 750.00$ 27,000.00$ 165.00$ 51,810.00$ 213.03$ 66,891.42$ 250.00$ 78,500.00$ 450.00$ 1,800.00$ 500.00$ 2,000.00$ 400.00$ 1,600.00$ 48.00$ 38,592.00$ 80.00$ 64,320.00$ 55.00$ 44,220.00$ 75.00$ 1,050.00$ 225.50$ 3,157.00$ 120.00$ 1,680.00$ 60.00$ 6,600.00$ 376.20$ 41,382.00$ 120.00$ 13,200.00$ 1.50$ 1,500.00$ 8.00$ 8,000.00$ 12.00$ 12,000.00$ 2,000.00$ 4,000.00$ 4,000.00$ 8,000.00$ 3,000.00$ 6,000.00$ 175.00$ 2,275.00$ 500.00$ 6,500.00$ 250.00$ 3,250.00$ 10.00$ 2,250.00$ 20.00$ 4,500.00$ 25.00$ 5,625.00$ 300.00$ 900.00$ 500.00$ 1,500.00$ 300.00$ 900.00$ 95.00$ 37,620.00$ 80.00$ 31,680.00$ 150.00$ 59,400.00$ 53,000.00$ 53,000.00$ 2,000.00$ 2,000.00$ 15,000.00$ 15,000.00$ 5.00$ 500.00$ 9.00$ 900.00$ 6.00$ 600.00$ 7.00$ 1,050.00$ 3.00$ 450.00$ 3.00$ 450.00$ 190.00$ 380.00$ 69.00$ 138.00$ 500.00$ 1,000.00$ 75.00$ 375.00$ 300.00$ 1,500.00$ 100.00$ 500.00$ 250.00$ 1,750.00$ 200.00$ 1,400.00$ 300.00$ 2,100.00$ 17,500.00$ 17,500.00$ 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 8.25$ 5,527.50$ 2.88$ 1,929.60$ 3.00$ 2,010.00$ 593,373.00$ 663,966.02$ 756,620.00$ -$ -$ -$ -$ -$ -$ 150.00$ 2,100.00$ 150.00$ 2,100.00$ 150.00$ 2,100.00$ 100.00$ 1,500.00$ 100.00$ 1,500.00$ 165.00$ 2,475.00$ 1,200.00$ 13,200.00$ 1,500.00$ 16,500.00$ 1,200.00$ 13,200.00$ 4.80$ 4,320.00$ 13.00$ 11,700.00$ 4.00$ 3,600.00$ 160.00$ 9,600.00$ 250.00$ 15,000.00$ 355.00$ 21,300.00$ 150.00$ 150.00$ 200.00$ 200.00$ 150.00$ 150.00$ 30,870.00$ 47,000.00$ 42,825.00$ -$ -$ -$ Legacy Supply Con TechPaladino Concrete Creations Page 3 of 4 Page 12 of 81 Bid Tabulation Sheet TA -22-05 Bid Opening Date: 3/25/2022 ITEM No. DESCRIPTION UNIT QUANTITY ADD ALTERNATE B - TIMBER GUIDE RAIL 203.02 Unclassified Excavation and Disposal C.Y. 19 555.0105 Concrete for Structure, Class A C.Y. 3 W606.9505 Timber Guide Rail L.F. 168 623.12 Crushed Stone (In Place Measure) C.Y.1 Subtotal ADD ALTERNATE C - PLANTS 611.0181 Planting - Major Deciduous Trees - 3 1/2" Claiper, B&B EA. 3 611.0211 Planting - Minor Deciduous Trees EA. 4 611.0381 Planting - Coniferous Trees - 8' height, B&B EA. 15 611.0442 Planting - Deciduous Shrubs - 2 foot height/spread EA. 47 611.0452 Planting - Deciduous Shrubs - 3 foot height/spread EA. 9 611.0711 Herbaceous Plants EA. 7 W611.1701 Irrigation Bag EA.7 Subtotal ADD ALTERNATE D - NEW ASPHALT PATH 203.02 Unclassified Excavation and Disposal C.Y. 14 304.11 Subbase Course, Type 1 C.Y. 10 608.020102 Hot Mix Asphalt (HMA) Sidewalks, Driveways Ton 20 Subtotal W800 Miscellaneous Additional Work F.L.S. 1 W851 Testing of Materials F.L.S. 1 Base Bid UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID Legacy Supply Con TechPaladino Concrete Creations -$ -$ -$ 110.00$ 2,090.00$ 150.00$ 2,850.00$ 150.00$ 2,850.00$ 850.00$ 2,550.00$ 1,000.00$ 3,000.00$ 1,200.00$ 3,600.00$ 130.00$ 21,840.00$ 100.00$ 16,800.00$ 125.00$ 21,000.00$ 150.00$ 150.00$ 200.00$ 200.00$ 150.00$ 150.00$ 26,630.00$ 22,850.00$ 27,600.00$ -$ -$ -$ -$ -$ -$ 1,100.00$ 3,300.00$ 1,394.32$ 4,182.96$ 950.00$ 2,850.00$ 975.00$ 3,900.00$ 1,157.99$ 4,631.96$ 1,200.00$ 4,800.00$ 550.00$ 8,250.00$ 921.67$ 13,825.05$ 875.00$ 13,125.00$ 90.00$ 4,230.00$ 115.79$ 5,442.13$ 105.00$ 4,935.00$ 127.00$ 1,143.00$ 189.52$ 1,705.68$ 100.00$ 900.00$ 33.75$ 236.25$ 56.72$ 397.04$ 60.00$ 420.00$ 200.00$ 1,400.00$ 57.50$ 402.50$ 150.00$ 1,050.00$ 22,459.25$ 30,587.32$ 28,080.00$ -$ -$ -$ 115.00$ 1,610.00$ 150.00$ 2,100.00$ 150.00$ 2,100.00$ 110.00$ 1,100.00$ 60.00$ 600.00$ 125.00$ 1,250.00$ 180.00$ 3,600.00$ 264.00$ 5,280.00$ 300.00$ 6,000.00$ 6,310.00$ 7,980.00$ 9,350.00$ -$ -$ -$ 1 45,000.00$ 1 45,000.00$ 1 45,000.00$ 1 5,000.00$ 1 5,000.00$ 1 5,000.00$ Base Bid 643,373.00$ Base Bid 713,966.02$ Base Bid 806,620.00$ -$ -$ -$ Base Bid +Alt A 674,243.00$ Base Bid +Alt A 760,966.02$ Base Bid +Alt A 849,445.00$ Base Bid + Alt A,B 700,873.00$ Base Bid + Alt A,B 783,816.02$ Base Bid + Alt A,B 877,045.00$ Base Bid + Alt A,B,C 723,332.25$ Base Bid + Alt A,B,C 814,403.34$ Base Bid + Alt A,B,C 905,125.00$ Total 729,642.25$ Total 822,383.34$ Total 914,475.00$ Page 4 of 4 Page 13 of 81