Loading...
HomeMy WebLinkAbout2023_07_11 Town Board Meeting Packet Woodard & Curran _ _ _ L Feasibility Assessment for Athletic Fields Adjacent to Hommocks Middle School July 11, 2023 Town of Mamaroneck, NY Presented By: Steven Lauria, PE, Senior Project Manager Thomas Shay, PE, Senior Technical Manager Scope of Feasibility Assessment ► Data Collection & Field Investigations ► Regulatory Permitting Review & Environmental Considerations ► Conceptual Layout ► Engineer's Opinion of Probable Construction Costs (EOPCC) Woodard$Curran Data Collection & Field Investigations Data Collection & Field Investigations ► Review of Existing Town Data • Former creek ran through the fields and has since been filled in • Existing borings available associated with the rink construction — rink is constructed on piles • Archived drawings note that the site had been used as a Town dump and excavation will result in debris. • Newer 72" coated CMP drain line installed between Hommocks and Flint Park in —2008. Replaced former dual pipes that filled in the creek. • Existing sanitary sewer line running through fields • Existing stormwater drain lines running through fields • Existing irrigation system present in the fields — appears to be a main line running N-S in the west and extension lines run E-W on —90' spacing Woodard$Curran Data Collection & Field Investigations ► Updated Site Survey T ^ T~warA a Y M1� BOARD OF CouCgnON OF.Nlr A""4RONECK �TMIN-Q�w'�G• y� (/ Y / \\`\- TOWN OFN/NIF ANANRONECX IUWN Woodard&Curran Data Collection & Field Investigations ► Environmental Database Reports (EDR) ■ Based on review of the historical Sanborn Maps and Aerial photos, East Creek and surrounding wetlands existed (prior to 1919- between 1964 and 1974) where the ballfields are today. ■ The subject property is identified as listed in the Recovered Government Archive Landfill for the years 2011 and 2012. ■ A sppill record was reported on February 7, 2007 (0612247) for two broken thermometers in a classroom. Case was closed on March S, Z007. • Subject Property is listed in the NY Cooling Towers Database for Air Conditioning unique equipment use. ■ Subject property is identified as listed in the Solid Waste Facility/Landfill Database under the name Hommocks Leaf Pen as an inactive site. The Town of Mamaroneck utilized the subject property for yard waste. • Subject properly is identified as a RCRA- Conditionally Exempt Small Quantity Generator for the Hazardous Waste Materials including ignitable waste, corrosive waste, chromium, lead and undefined waste. No violations were reported for this listing. ■ The subject property was identified as listed in the NY Manifest database for transfer of 20 pounds of material to an incineration facility in 2018. ■ The subject property is identified as listed in the FINDS and ECHO databases for it's RCRA facility status, however based on review of the online database records, no historical or current violations were reported and the facility is in compliance. ■ Subject property is not registered as listed in the LUST AST or UST databases, and based on a review of historical Sanborn Maps/Aerial Photos provided, there isn't any observes( indications of registered or documented historical use of tanks on the property. ■ Based on review of the surrounding adjacent properties: Sanitary Sewer Overflow Retention Facility - Flint Park is identified as listed in the NY State Chemical Bulk Storage database. A quick review of all adjacent properties that have either been identified in the NY Spills, Leaking Underground Storage Tank, Above-Ground Storage Tanks and Underground Storage Tank databases all indicate that the spills are either closed and/or historical or minor in nature. Based on the information provided by the EDR report, the surrounding adjacent property listings are unlikely to impact the environmental integrity of the subject property. Woodard$Curran Data Collection & Field Investigations HOMMOCKS MIDDLE SCHOOL FIELD LEGEND: 4/1D23 G eotec h n i ca I Borings INVESTIGATIONS( ) OPEN GRATE DRAINAGE MANHOLE ► TOWN OF MAMARONECK,NY RIM TO wv:e' ONSITE:OP 8 JPN s i rCTR!C,AL T+u 10 Borings completed April 10, OPEN GRATE DRAINAGE MANHOLE ■ flIM TO INV:10'-2' 2023 i-t 4 • General stratum summary. (MEASURED FROM FENCE 6" Topsoil (MEASURED "^ CORNERS) FFXNA CENTER OF DOUBLE 5' to 10' of fill GATE) (DEAD N*)'Ili QEPIPE eu, 12 1' to 10' of organics 6T HDPE DRAINAGE LINE Sand/silt after organics RMINUS EEOFPIPEWNVERT o-+o ELEVVATIONATIONS UNKNOWN) N9 Bedrock refusal in some instances A5 • Filling and organic layers au thicker at historic creek areas • and moving from east to west • Groundwater encountered75 8-10' below ground surface 8° GENERAL NOTES: -NOT TO SCALE,DIMENSIONS ARE BASED OFF OF FIELD MEASUREMENTS. -MEASUREMENTS MADE TO NEAREST 112 FOOT -APPROXIMATE LOCATIONS GIVEN FOR UTILITIES AND BORINGS. BORING LOCATIONS WERE GPS LOCATED USING GOOGLE MAPS.(FIELD • • ' COLLECTOR APP WAS UNNAVAILABLE). Z k Woodard&Curran Regulatory Permitting Review & E nvironmental Considerations Regulatory Permitting Review & Environmental Considerations List of anticipated permits, approvals, and environmental considerations to address: • NYSDEC SPDES Permit for Stormwater Discharges During Construction • Work within the 100-year FEMA Floodplain • SEQR Critical Environmental Area (East Creek, Hommocks Conservation Area, Hommocks Salt Marsh Complex, Hampshire Country Club, Long Island Sound) • USACE/NYSDEC/NYSDOS Joint Application SC Stream (Stream 935-69) • Tidal Wetlands Coastal Consistency (Coastal Area with a Local Waterfront Revitalization Program/Plan) ■ SHPO Archeological Sensitive Area • Dark-Sky Compliance (Athletic and Parking Lighting) • Synthetic Turf System Materials Natural Infill (shock pad required) *This is not a final or exhaustive list Woodard&Curran Regulatory Permitting Review & Environmental Considerations According. to Public Database Review, the project site does not include any of the following: ► Not located within 2000' of any site in the NYSDEC Environmental Site Remediation Database ► No unique geologic features ► Waterbodies are not listed as impaired ► Not a designated floodway ► Not a sole source aquifer ► No significant natural communities ► No state or federal endangered or threatened species ► No rare plants or animals ► No agricultural district ► No registered national natural landmarks ► Lighting towers do not exceed FAA OE/AAA Notice Criteria .e$Z Woodard a Curran Conceptual Layout Conceptual Layout ► Scope of Conceptual Layout: • Synthetic Turf Field (Multi-Sport, Natural Infill, 60 yds x 110 yds Playing Lines) • Chain Link Fencinq (Site Perimeter) and Ball Netting (at Synthetic Turf Field Endlines and 60' Up Sidelines) • Natural Grass Open Space (Allowing for 60 yds x 110 yds playing lines) • LED Athletic Field and Parking Lighting • Scoreboard (at Synthetic Turf Field) • Spectator Seating (+/- 200 Spectators) • Storage and Restroom Building (+/- 800 SF) • Outdoor Seasonal Ice Rink • Walkways (ADA Compliant) • Parking Area • Earthwork (No Filling in 100-Year Floodplain) • Site Utility Infrastructure 25� Woodard$Curran Conceptual Layout ► Primary Factors and Constraints: • Town programming preferences Synthetic Field Located to the North and Contiguous Open Space to the South • Impacts to existing facilities and operations (No Impact to Existing Ice Rink Facility) • Overlap with County sewer easement (County Confirmed Acceptable) • Overlap with existing drainage utilities • Elevation within the 100-year floodplain (flooding risk and earthwork in the floodplain) • Proximity to the tidal wetlands and the adjacent area/buffer • Property boundary (particularly the irregular southern property line shared with Village of Larchmont Flint Park) • Subsurface site conditions (historical filling and differential settlement). • Preferred athletic field orientation lei Woodard&Curran Conceptual Layout (ToM Recommended) •,. OSEO Zan ffx' _.._ _ l 1 .... x.,.—w.o.osco e'v: �miso<m.Mxwc ior. � cM.fEnR.'srz - uux+c s+.0 � .ExrcrEx-Wrt mcs, —11 auw:mr�m `� Eounaxs.xo sacs rsc \ \ nxyoxoI�ia.ourx 1 \ • E \� � �.WMWIL MEy9llif� �Y'' ; ' \��•. -EuSnxG x.nYW fF.A OxEx So.aE. \ f' �iMUWip4 Nq Oxwua 1n IlExxn. \ \ \ �,•• SOC¢II fRD LIMES 9WMx IOn \ � , pgp5lpME x[iEIKMCf. xf11W6 Ai \`�\ �\` �� �!1\\flEbtlfi! iB/111ieif il:ffiiYi Elfi! �oumcox cE xn.x \a* ~om�favr�iwn rn \\4' Woodard$Curran Conceptual Layout (ToM Recommended) MAINTAIN ACCESS TO EXISTING INFRASP2UCTVRE PROPOSED HIGH CHAIN LINK PROPOSED 200 FENCE AT SITE PERIMETER $EAT BIEACNERS _ -W1E TYPES.LOCATIONS,AND 7BD - •:- PROPOSED MULTI-SPORT 51NTMETIC TURF FIELD NATURAL INFILL .0" ASSUMED TIDAL NETLAND ADJACENT AREA/BUFER PROPOSED PARKING (EL.10) 101-FINAL PARKING SPACE OUANIITY TOO ♦. A 1PROPOSED— - EXISTING NATURAL GRASS UOIIT POLE. OPEN SPACE.IRRIGATION,AND v (TYP.OF♦) DRAINAGE TO REMAIN. SOCCER FIELD LINES SHONN FOR DIMENSIONAL REFERENCE. III DROPOSED AT (TYP.) PROPOSED SCOREBOMO BALL NETTING AT END $Iy�' LINES AN0 60'UP 4DEUNES(TYP.) 1...PROPOSED RESTRDOM AN STORAGE BUILDING LS k4Y a.,PROPOSED SEASONAL r WTDOOR ICE RINK u� -FINAL LXAIION AND OPIENTATION TBO A l -7- Woodard&Curran Conceptual Layout (Alternative 1 ) ..< .0.c U.D. it PPDPD]F.D ftk(bW nP.WiD�..\ . ,• tl'I ,"ta^'r. PfMWEriF d rTCC '- ntP+ II MWD]ED 300]E,r BLE,CkiP]-. b�PP 4P,P 1�. I .,Prr,1;•a•.. 7.0! R \ PPDPDCm rpeueu aEnuEPe r:se x.a e.on Pko^osco.,Ek.k.(m.� Psr.n i�cwtinr r'ciD PR[fOSED rar,�9UNr 4b •m w�nwt,.wru r]nwPa aruY quo 4� b� I� ..wwSw..".w.r. - r�"• sm�cvoe titi\ ®.. Woodard&Curran Conceptual Layout (Alternative 1 ) Jill PROPOSED SCOREBOARD AND SOUND t SYSTEM PROPOSED FENGNO No yy _ PERIMETER OF FlELO PROPOSED LIGHT POLE (TW.OF 6) PROPOSED 200 SEAT BLEACHERS PROPOSED PORTABLE BLEACHERS (328 SEATS EACH) PROPOSED PROPOSED PROPOSED WALKWAY MULTI-SPORT MULTI-SPORT (n'P) SYNTHETIC TURF NATURAL FIELD KITH ORASS FlEID NATURAL INFILL 3 BALL NETTING AT END - LINES AND 60'UP SIDELINES(TYP.) PROPOSED PICNIC AREA N1TH SHADE ( STRUCTURE Woodard&Curran Conceptual Layout (Alternative 2) 15,you IJ roam Perking La 6 tp+ Mu10-Sport Natural Gras AtNetic Field RfAIr00111 t81d Staaga 1 ulft (20WO') MuM-Sport Syntheft Turf Field WiM Natural Infie •4: Space for eas Sonal Outdoor Ice Rink e Woodard$Curran Conceptual Layout (Alternative 2) m � ,so•f• wwLL e •.ff f 1 •f••r 4 Tug laid With •... . . .. r +uonww uwwl :w •e P•e � Woodard&Curran Engineer 's Opinion of Probable Construction Costs ( EOPCC) Engineer's Opinion of Probable Construction Costs (EOPCC) Summary Order of Magnitude: +/- $5,500,000 ScopePrimary Construction Components General Conditions Bleachers Sitework and Stormwater Restroom and Storage Building Synthetic Turf Field Parking Lot and Lighting LED Athletic Field Lighting Site Fencing Electrical Service Allowance Walkways Scoreboard Site Amenities and Sports Equipment Natural Grass Advanced Maintenance Estimating Contingency(20%) *This cost opinion is preliminary and is intended as a guide to help with initial project budgeting and fund allocation.Estimates can be revised as design progress is made in order to develop more accurate project cost projections. Woodard a Curran Engineer's Opinion of Probable Construction Costs (EOPCC) Summary EOPCC Notes: ► Scope and quantities included in this estimate are based on preliminary concepts and aerial takeoffs. ► Construction General Conditions includes general contractor's overhead costs associated with Division 01 specifications including, but not limited to, insurance, bonding, mobilization, etc. ► Item 9 allowance for off-site disposal of excess fill material assumes that the existing material meets NYSDEC restricted residential use criteria. Testing is required to determine soil classification for disposal purposes during construction. ► Assumes general contractor is contracted with Town of Mamaroneck and the project that complies with prevailing wage labor rates. ► Does not include repairs or replacement of existing site utilities. ► Assumes that a final grading plan can accommodate no net filling within the 100-year floodplain and there is no need to provide compensatory storage. ► Differential settlement mitigation allowance is intended to set aside funds for solutions that are to be determined for reducing the potential for and impacts from differential settlement for proposed surfaces (e.g. synthetic turf, asphalt parking area, etc.). ► Assumes proposed stormwater discharge is directly to a tidal waterbody, therefore flow attenuation is not required. ► Does not account for costs associated with a seasonal outdoor ice rink. ► Does not include soft costs associated with design development, permitting, bidding, contractor procurement, design services during construction, resident project representative, etc. Woodard$Curran Q&A Woodard Steven Lauria, PE, Senior Project Manager & Curran Thomas Shay, PE, Senior Technical Manager Woodard &Curran TECHNICAL MEMORANDUM TO: Jaine Elkind Eney, Supervisor, Town of Mamaroneck CC: Robert Wasp, PE, CDT, Town Engineer,Town of Mamaroneck Anthony C. Catalano, PE, BCEE, Senior Principal,Woodard &Curran PREPARED BY: Thomas P. Shay, PE,Technical Manager, Woodard &Curran REVIEWED BY: Steven Lauria, PE, Project Manager,Woodard &Curran DATE: June 13, 2023 RE: Regulatory Permitting Review Associated with the Feasibility Assessment for Town of Mamaroneck Fields Adjacent to Hommocks Middle School We understand that the Town of Mamaroneck is evaluating the redevelopment of the open space area to the rear(east)of the Hommocks Middle School property,south of Hommocks Road,and north of Flint Park. The existing area is currently open lawn and used as athletic fields. The project components under consideration include a multi-sport synthetic turf athletic field, a multi-sport natural grass athletic field, LED athletic field lighting, a shade structure with picnic tables, walkways, and related amenities and supporting utility infrastructure.As part of Woodard &Curran's approved scope for the Feasibility Assessment for Town of Mamaroneck Fields Adjacent to Hommocks Middle School, we have prepared the following preliminary regulatory permitting review. REGULATORY PERMITTING REVIEW Based on review of various public databases, mapping, and our team's experience, the following is a preliminary list of anticipated permits, approvals, and environmental conditions that we expect will be necessary to investigate further and potentially obtain some form of approval for during the design and permitting phase of the project. 1. NYSDEC SPDES Permit for Stormwater Discharges During Construction (Notice of Intent) • Stormwater Quality • Stormwater Flow Attenuation • Stormwater Pollution Prevention Plan (SWPPP); including Erosion &Sediment Controls 2. Work within the 100-year FEMA Floodplain (No filling) 3. State Environmental Quality Review (SEQR) a. Critical Environmental Area (East Creek, Hommocks Conservation Area, Hommocks Salt Marsh Complex, Hampshire Country Club, Long Island Sound) 4. USACE/NYSDEC/NYSDOS Joint Application • Tidal Wetlands (and Adjacent Area/Buffer) • SC Stream Classification (Stream 935-69) • Coastal Consistency(Coastal Area with a Local Waterfront Revitalization Program/Plan) 5. SHPO Archeological Sensitive Area Town of Mamaroneck(0214798.00) 1 Woodard&Curran Eng and Geo Svcs P.A. P.C. Regulatory Permitting Review June 13,2023 Woodard &Curran Based on review of the public database and mapping information, the proposed project/site is not anticipated to include permitting or approvals associated with any of the following criteria: 1. Project site is not located within 2,000 feet of any site in the NYSDEC Environmental Site Remediation Database 2. No unique geologic features 3. Waterbodies are not listed as impaired 4. Not a designated floodway 5. Not a sole source aquifer 6. No significant natural community 7. No state or federal endangered or threatened species 8. No rare plants or animals 9. No agricultural district 10. No registered national natural landmarks 11. Athletic field lighting towers do not exceed FAA OE/AAA Notice Criteria In addition to the formal permitting requirements, it is anticipated that the design will incoporate the following considerations for a more environmentlaly responsible project: 1. Dark-Sky Compliance (athletic and parking lot lighting) 2. Synthetic Turf System Materials • Natural Infill (shock pad required) Please note that extent of the permitting and approvals scope and associated requirements may only be known upon submission of formal jurisdictional request determinations to the respective agencies and once the final scope of design and construction is determined. Refer to the attachments for various database maps and reports related to the permitting review. Attachments: Attachment 1:FEMA FIRM Attachment 2:NYSDEC Environmental Resource Mapper Attachment 3:NYSDEC EAF Mapper Summary Report Attachment 4:SHPO CRIS Archeological Sensitive Area Attachment 5:FAA OE/AAA Notice Criteria Tool Results Town of Mamaroneck(0214798.00) 2 Woodard&Curran Eng and Geo Svcs P.A. P.C. Regulatory Permitting Review June 13,2023 Attachment 7: FEMA FIRM eniu.w Yp« eOY.ra'^ �•� 4orw �aurnwY a Swan APPROXIMATE: PROJECT SITE LOCATION F i `V / o YOIe,G MO0DMN6 uwe•me wMw,twro,.e vv,iw FDYwn a,aaa� �� � f 1 � j ......s m15TY.FIIw1CM a150UR5 MTfN fmR41�`.S �N���Ya.Memaata+v mn.a,an G.awcBn..,+ -- � ( ; _ � »fEYlY M0iK1FY MFAS fOM.I IY.ati c.mwc.SYwr � .� �/✓ :� "`11 .�a.«nw. ea.«r a.v.Spy YnYaa im'oJmi ' �• ^�'^ �' ................ w .a,a.uw. Gm,<�Swwy n laa,l arNNi a w.,n.nawKa �.t. �• '. ""- _ _ Y. fmm Ya.Yw vw.FA vn M+ .> \ { f ,Y.>r w.Y«,nY w.F.n.i.Y.Y Fm.o,Y•r+,..a...e« .. .. � �.. .�.. =ann.M,.a.n.mpn , ..n.«,,..„Mnan,w,Mw..,,o.,,, . ., ev...w.•o-.Y..nw���n.,,� i - .. �,� --__.... �� - Q � r.wn.m.mn'...`."."'Y...,...e.. /': Ynr wro,Y.eu Fina Y�v„Y.. »i�E � NrMrxVJ%9pi0 au in�Iecrm.�.,»�b�'~� ..•. `� � ,[/,_{/l -� �� E n,Q.,we Wvww�rernar,w aN,mugp�n�npur ae. EY.Y.>,,.ni�i6.wiir,� � �f �--J: ON r wv ur• n.e,eu 5ua,avtsaa.w-r . L.. 1U19U' PANEL—IF UUU ... FIRM FLOOD wwnANR PATE WH ,N'a-STTCHESTEA COUNTY,MEW YOM[ 6gCTpN3) 1 CONTAIN � Cpe9.n,Nm N,lws R LARCNMONT,VILLAGE 360915 OF MAMARONECK TOWN OF 360917 \ MAMARONECK VELAGE M16 OF 2� f PANEL7610E— ' � MAP SUfFI�:Fr_ «w. MAP NUMBER 36119CO361F Attachment 2: NYSDEC Environmental Resource Mapper ` NYSDEC ENVIRONMENTAL RESOURCE MAPPER Y� APPROXIMATE PROJECT SITE LOCATION o❑Towns f7 Tax parcels O Base Flood Elevation Plus 72/75 inches Sea-level Rise �'--- limit to Moderate Wave Action Waterbody Inventory/Priority Waterbodies List ®takes and Reservoirs Estuaries Rivers and Streams ice,j shorelines ' 0 National Wetands Inventory \ E Estuarine and Marine Deepwater ❑ Estuarine and Marine Wetland �_���"'�.., , ❑ Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond ._... ` lake Other � � l � I i s 6 . Attachment 3: NYSDEC EAF Mapper Summary Report EAF Mapper Summary Report Monday, May 1, 2023 1:51 PM v Disclaimer: The EAF Mapper is a screening tool intended to assist - project sponsors and reviewing agencies in preparing an environmental ,� assessment form(EAF).Not all questions asked in the EAF are a - answered by the EAF Mapper.Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although 5+ l0 the EAF Mapper provides the most up-to-date digital data available to 46 DEC,you may also need to contact local or other data sources in order - to obtain data not provided by the Mapper.Digital data is not a a substitute for agency determinations. et!!! 'y t F. t o0/ Ma�troi iY`Qrit;�+t; ' rY M a ToroNto e r ch°'l'r m #y a`rllrlxsch~ tau�p o mb.irry LO `t Ftir11 F<lrh rrl> ,1~atkan Boston i <ti Cleveland Prartdehrc CT tw. 'iy Pittsburgh � rl rota a Phlladelphit anwil,LIS�Intennap,.INCRIUAEt}TP, NRCan. Esli Japan,MElhesn China(Hong Kongi,Esri ttA T�,I�karl, Esn)ipan,PaETI,Esd Chna (Hong 1 iiJ, Esn Korea, rl(fhallat1q, NGCC. �1 Ope+1Streetlq�lap C011tribUtor;; Ildtile GIS 1 er Cull)Ill ulllty F(Idp0i)alStre�h.lal�colltnby�y�i�l�`tlotrile GI Usel'C�7mm uNty B.i.i [Coastal or Waterfront Area] Yes B.i.ii [Local Waterfront Revitalization Area] Yes C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook. E.1.h.i [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook. E.1.h.i [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook. E.1.h.iii [Within 2,000'of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Yes E.2.h.ii [Surface Water Features] Yes E.2.h.iii [Surface Water Features] Yes- Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. E.2.h.iv[Surface Water Features-Stream 935-69 Name] E.2.h.iv[Surface Water Features-Stream Sc Classification] E.2.h.iv[Surface Water Features-Wetlands Tidal Wetlands, Federal Waters Name] E.2.h.v[Impaired Water Bodies] No E.2.i. [Floodway] No E.2.]. [100 Year Floodplain] Yes E.2.k. [500 Year Floodplain] No Full Environmental Assessment Form - EAF Mapper Summary Report 1 E:2.1. [Aquifers] No E.2.n. [Natural Communities] No E.2.o. [Endangered or Threatened Species] No E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] Yes E.3.d [Critical Environmental Area - Name] East Creek, Hommock's Conservation Area, The Hammocks Salt Marsh Complex, The Hommocks Salt Marsh Complex, Hampshire Country Club, Long Island Sound E.3.d.ii [Critical Environmental Area- Important coastal fish &wildlife, Exceptional or unique character as an Reason] aesthetically important area, Protect water&natural area, Important coastal fish &wildlife habitat E.3.d.iii[Critical Environmental Area— Date Agency:Mamaroneck, Town of, Agency:Larchmont, Village of, and Agency] Agency:Westchester County, Date:9-16-89, Date:2-22-89, Date:2-2-85, Date:8- 31-89, Date:1-31-90 E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF Places or State Eligible Sites] Workbook. E.3.f. [Archeological Sites] Yes E.3.i. [Designated River Corridor] No Full Environmental Assessment Form - EAF Mapper Summary Report 2 Attachment 4: SHPO CRIS Archeological Sensitive Area 06 RTvio HOME SUBMIT SEARCH) COMMUNICATE C1tIIMrvd P-eaaert4 Mtorn,. "„t ►O ._ �' _ - leas . c` + ■ f Buildings tee, -PC Landmorla o Cemeteries DOT BtNs i t 94V Budding Footprints Ra4-4 +� - LSNB -ng I.—t—w) National Register Building Listings A anvsmn c} Erg..' Budding Districts S hc.�l _ Listed ")J JJ Archaeology Surveys ',P9 ■ ract gg;b;e (f� Building Surveys e aQ ■ r+or gbe-oemo6sheC � [pG Consultation Projects ■ unoe!e—ined LPC Historic Districts o� rchaeo cal Buffer AreasL m Nehenei C.gisrer euadinq saes A �) Y Certified Local Governments ut. Qualifying Census Tracts e State Park Land USN Building Districh(View) v Adirondack Forest Preserve NHL Boundary i p EGgioe Bedrock Geology onR■Q Core'Stoh,ses 1 18th Congressional Districts `. .� tiCl}n}_[M_ h^,inorCivil DlvisionS w -n-�,i 't _ - ey eo,idi,g Ar— V;-1 c '`i c`� ■ bd � ;■ p■ ��9�J`� - �p oo ■ il;u, .,�r�ov Ar�ncco oyy A,—(view) '7 O Or �Ra C N " ■ ■ R'1 eo—liatio,Project(view) j �yp Cam\ per■ Ltd S.4 R � -. a` a ,rJ ■ C ■ L ■ Zd ■ Arc na eological BuRcr Area; h ■ c c ■ J+Sk r ■,�oyy a° c, ■or drr 4 h Ie. ■ ■ e goo' l Y " ■ e 44e ■ �`'Qro I r, ■ '" "Son 4s ■ i7 ■ � `�y,, Q ■Q�4�e ■ a� r'/ - �S ■ Attachment 5: FAA OE AAA Notice Criteria Tool Results 5/4/23,3:52 PM Notice Criteria Tool Federal Aviation « OE/AAA Administration Notice Criteria Tool Notice Criteria Tool-Desk Reference Guide V 2018.2.0 The requirements for filing with the Federal Aviation Administration for proposed structures vary based on a number of factors:height,proximity to an airport,location,and frequencies emitted from the structure,etc.For more details,please reference CFR Title 14 Part 77.9. You must file with the FAA at least 45 days prior to construction if: . your structure will exceed 200ft above ground level . your structure will be in proximity to an airport and will exceed the slope ratio a your structure involves construction of a traverseway(i.e.highway,railroad,waterway etc...)and once adjusted upward with the appropriate vertical distance would exceed a standard of 77.9(a)or(b) . your structure will emit frequencies,and does not meet the conditions of the FAA Co-location Policy . your structure will be in an Instrument approach area and might exceed part 77 Subpart C . your proposed structure will be in proximity to a navigation facility and may impact the assurance of navigation signal reception . your structure will be on an airport or heliport . filing has been requested by the FAA If you require additional information regarding the filing requirements for your structure,please Identify and contact the appropriate FAA representative using the Air Traffic Areas of Responsibility map for Off Airport construction,or contact the FAAAirports Region/District Office for On Airport construction. The tool below will assist in applying Part 77 Notice Criteria. •Structure Type: POLE I Light Pole V Please select structure type and complete location point Information. Latitude: 40 Deg 56 M 01.07 S N V Longitude: F7-3 ---1 Deg ®M 35.56 S W V Horizontal Datum: NAD63 V Site Elevation(SE): 12 (nearest foot) Structure Height: 100 (nearest foot) Is structure on airport: Q No O Yes Results You do not exceed Notice Criteria. https://oeaaa.faa.gov/oeaaa/external/gisTools/gisAction.jsp 1/2 5/4/23,3:52 PM Notice Criteria Tool 1 it I 1 fi i i I j I fi E https:Hoeaaa.faa.gov/oeaaa/external/gisTools/gisAction.jsp 2/2 EX ACC TO c APB a EIOSTING INFRASTRUCTURE %i'%3 • TC H WAS"1�' y,aE ,\,?'. ; • ,. PRaNIsED 26D SEAT Woodard sw.H I,nr E:°� C C•.J --�'BLEACHERS / n x Curran SM 3.45 / + PROPOSED 8'HIGH CHAIN LINK FENCE AT SITE PROPOSED PARKING LOT - — =_ -=-aL_ -- PERIMETER-GATE TYPES, -FINAL PARKING SPACE d ---___ LOCATIONS,AND SIZES TBO QUANTITY TBD PROPOSED MULTI-SPORT PROPOSED LIGHT SYNTHETIC TURF FIELD WITH POLE (TYP OF 4) NATURAL WILL ASSUMED TIDAL WETLAND ADJACENT AREA/BUFER (EL 10) EAISTINC NATURAL GRASS OPEN SPACE, \ / \ IRRIGATION,AND DRAINAGE TO REMAIN. < \ i♦1 SOCCER FIELD LINES SHOWN FOR iii♦ \\ \\ \\\ A. I♦♦♦♦♦DIMENSIONAL REFERENCE. PROPOSED SCOREBOARD PROPOSED WALKWAY(TYP.) }�O \\\\ iiijii♦i I\\\\ ,�\/\\�/� ♦♦♦♦1♦♦♦♦♦♦♦iili♦i BALL NETTING AT END LINES /� \� ' ♦i♦♦♦♦ E AND 60'UP SIDELINES(TYP.) \\ \\ 4♦i \// / `� 1♦♦♦1♦ TOWN OF MAMAAONECK HOMAOCKS MIDDLE SCHOOL \ / ATHLETIC FIELDS PROPOSED RESTROOM AND \ /^ \\ \\ /// \\ \\\ /// ��, /aX\ / '/A ,t e G STORAGE BUILDING y 41 t✓ 1 �° I PROPOSED SEASONAL �\ .c/' � �` � \�� •\ OUTDOOR ICE RINK -FINAL LOCATION AND - ORIENTATION TBD RIM: 1 '\ 5.9 H. •� \" \\ / �•\ CONCEPTUAL LAYOUT PLAN /,_ _ �� \� Ia �� • .�FIG.1 +I EIOSTING WRASIRUC7URE Ae? ,• PROPOSED 0'HIGH FJIAIN LINK PROPOSED FENLE AT SITE PERIMETER SEAT LREACNERS -WTE 7tPE5.LOCAnaS,AND Woodard 9IE5 7W a _ &Curran 1-� - sNTNEnc�vn T "°• � RI1M NATURAL INFILL "�^" . .. ASSUMED nOAI LA:nANO ROP PARKING ADJACENT AREA/BUFER LOP OSED-FlNAL PARKING (� @`TO) - $PACE WANn TY TBD �� I v a_ • T J X -- PROPOSED-- EKISTHG NANRAL GRASS L UGHT POLF ( OPEN SPACE,IRRIGATION.AND DRAINAGE TO REMAIN. s � I SOCCER FMUD ONES SHORN FOit DIMEN90NAL REFEREIJGF. PROPOSED WALKWA, SCDREBCP.40 ._ ■_. 8Al1 NErnwc AT END IJNES AND AO•UP ' SIDELINES T� PROPOSED O AND STORAGE BUUIILDINC pl, j o. y �. 1 4 Aim �v ftIRIMF PROPOSED SEASONAL A '^T •4 - . WTDOOR ICE RINK N AA'" -FlNAL ORIENTATION AND i i E ORIENTATpI '.t I_ L. {.. .• t �. 1.' a ..,'n° �. A TOMM OF MAMANONECK • e ' A HOMMOCKS MIDDLE SCHOOL ATHLETIC FIELDS s a n NW�N. M OVERALL SITE PLAN ,K Preliminary Engineer's Opinion of Probable Construction Costs Hommocks Middle School Athletic Fields Town of Mamaroneck,NY Woodard Prepared by Woodard&Curran &Curran Updated 6/13/2023 Item Item Description Qty Unit Unit Price Extended Price 1 Temporary Construction Fence 1 LS $ 15,000.00 $ 15,000.00 2 Erosion&Sediment Controls 1 ALLOW $ 25,000.00 $ 25,000.00 3 Site Demo and Disposal(Fence,Trees,Asphalt) 1 ALLOW $ 20,000.00 $ 20,000.00 4 Construction and Materials Testing 1 LS $ 10,000.00 $ 10,000.00 5 Surveying and Layout 1 LS $ 10,000.00 $ 10,000.00 6 ISite Restoration(topsoil,seed,mulch) 1 ALLOW $ 50,000.00 $ 50,000.00 7 Landscaping(Screening) 1 ALLOW $ 25,000.00 $ 25,000.00 8 Earthwork(+/-1'Avg.Cut for Proposed Surfaces) 4500 CY $ 15.00 $ 67,500.00 9 Excess Soils Disposal 1 ALLOW $ 400,000.00 $ 400,000.00 10 Differential Settlement Mitigation(Solution(s)TBD) 1 ALLOW $ 250,000.00 $ 250,000.00 11 Stormwater Quality Treatment 1 ALLOW $ 175,000.00 $ 175,000.00 12 Stormwater Collection and Conveyance 1 ALLOW $ 75,000.00 $ 75,000.00 13 Collector Drains 1100 LF $ 85.00 $ 93,500.00 14 Geotextile 70000 SF $ 0.25 $ 17,500.00 15 Synthetic Turf Field Stone Base IT'depth,No.57 Stone) 1600 CY $ 65.00 $ 104,000.00 16 Synthetic Turf Field Leveling Course Stone(1"depth) 250 CY $ 100.00 $ 25,000.00 17 Laser Grading 90000 SF $ 0.25 $ 22,500.00 18 Shock Pad 70000 SF $ 2.25 $ 157,500.00 19 Synthetic Turf and Natural(Wood)Infill 70000 SF $ 5.75 $ 402,500.00 20 Synthetic Turf Performance Testing 1 LS $ 7,500.00 $ 7,500.00 21 Synthetic Turf Maintenance Equipment(Groomer,Sweeper,Magnet) 1 LS $ 8,000.00 $ 8,000.00 22 Concrete Curbing at Synthetic Turf Field 1100 LF $ 40.00 $ 44,000.00 23 Ball Netting(Endlines and 60'Up Sidelines) 640 LF $ 125.00 $ 80,000.00 24 New 8'CLF and Gates(Site Perimeter) 1750 LF $ 85.00 $ 148,750.00 25 INatural Grass Field Advanced Maintenance(Aerate,Topdress,Overseed) 90000 SF $ 1.00 $ 90,000.00 26 Maintain Irrigation Service and Drainage at Open Space Lawn Area 1 ALLOW $ 50,000.00 $ 50,000.00 27 Electrical Service,Equipment,Cable/Wiring/Conduit 1 ALLOW $ 350,000.00 $ 350,000.00 28 Athletic Field Lighting(LED,4 Poles) 1 ALLOW $ 350,000.00 $ 350,000.00 29 Bleachers(+/-200 seats) 1 ALLOW $ 250,000.00 $ 250,000.00 30 Player Benches w/Backrest 8 EA $ 1,500.00 $ 12,000.00 31 Soccer Goals 2 PAIR $ 7,500.00 $ 15,000.00 32 Lacrosse Goals 2 PAIR $ 2,000.00 $ 4,000.00 33 Park Benches 4 EA $ 2,000.00 $ 8,000.00 34 Bike Racks 2 EA $ 1,000.00 $ 2,000.00 35 Trash/Recycling Receptacles 10 EA $ 1,000.00 $ 10,000.00 36 Walkways 5100 SF $ 15.00 $ 76,500.00 37 Parking Lot Asphalt Section 14100 SF $ 12.00 $ 169,200.00 38 Parking Lot Concrete Curbing 760 LF $ 40.00 $ 30,400.00 39 Parking Lot Lighting 1 ALLOW $ 50,000.00 $ 50,000.00 40 Storage and Restroom Building 800 SF $ 500.00 $ 400,000.00 41 Scoreboard 1 ALLOW $ 65,000.00 $ 65,000.00 Construction Subtotal: $ 4,165,000.00 Construction General Conditions(7%): $ 292,000.00 Estimating Contingency(20%): $ 833,000.00 Construction Total: $ 5,290,000.00 Notes: 1. Scope and quantities included in this estimate are based on preliminary concepts and aerial takeoffs 2. Construction General Conditions includes general contractor's overhead costs associated with Division 01 specifications including,but not limited to,insurance,bonding,mobilization,etc. 3. Item 9 allowance for off-site disposal of excess fill material assumes that the existing material meets NYSDEC restricted residential use criteria.Testing is required to determine soil classification for disposal purposes during construction. 4. Assumes general contractor is contracted with Town of Mamaroneck and the project that complies with prevailing wage labor rates. 5. Does not include repairs or replacement of existing site utilities. Page 1 of 2 6. Assumes that a final grading plan can accommodate no net filling within the 100-year flood plain and there is no need to provide compensatory storage. 7. Differential settlement mitigation allowance is intended to set aside funds for solutions that are to be determined for reducing the potential for and impacts from differential settlement for proposed surfaces(e.g.synthetic turf,asphalt parking area,etc.). 8. Assumes proposed stormwater discharge is directly to a tidal waterbody,therefore flow attenuation is not required. 9. Does not account for costs associated with a seasonal outdoor ice rink. 10. Does not include soft costs associated with design development,permitting,bidding,contractor procurement,design services during construction,resident project representative,etc. *This cost opinion is preliminary and is intended as a guide to help with initial project budgeting and fund allocation. Estimates can be revised as design progress is made in order to develop more accurate project cost projections. Page 2 of 2 Phone WHITE PLAINS, N.Y. (203) 262-9328 (914) 946-4850 Telefax (203) 264-3414 SOILTESTING, INC. 90 DONOVAN ROAD - OXFORD, CONN. 06478-1028 GEOTECHNICAL / ENVIRONMENTAL SUBSURFACE INVESTIGATIONS - Test Borings - Core Drilling Monitoring Wells - Recovery Wells - Direct Push/Probe Sampling UNDERPINNING - HELICAL PILES - SOIL NAILS April 11, 2023 Woodard & Curran 800 Westchester Ave., Suite N507 Rye Brook NY 10573 Attn.:Thomas Shay Re: 130 Hommocks Road G68-2472-23 Larchmont NY Dear Mr. Shay, Attached please find the Test Boring Logs and location plan for the above referenced site as well as our invoice. If you have any questions, please do not hesitate to contact us. Very truly yours, s A. DeAn resident D?mv SOILTESTING, INC. Woodard&Cu DATE ................P To............. Curran 11-A r-23 ADDRESS............. 800 Westchester Ave., Rye Brook NY 10573 . ..................................... ....... .... SITE LOCATION ......... .... 130 Hom mock Rd;,Larchmont NY ..................................•••.......... .. ............... REPORTSENT TO ... Thomas Shay .. ........................................................ ........._................ SAMPLES SENT TO Storage (Max 60 days)................................................................................ 90 Donovan Road Oxford, Connecticut 06478-1028 203-262-9328 JOB NO Branch Office: G68-2472-23 White Plains, New York 10607 914-946-4850 SOILTESTING, INC. CLIENT Woodard & Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-1 OXFORD, CT 06478 PROJECT NO G68-2472-23 _ CT (203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY(914) 946-4850 _ Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road MK/eq _ Larchmont NY_ INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 +' 1 3/8" DATE FINISH 4/10123 AT none FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV. AT FT AFTER—HOURS--- HAMMER FALL 30" GROUND WATER ELEV. SAMPLE BLOWS PER 6 IN CORE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL. = CASING OR CHANGE COLOR LOSS OF WASH WATER SEAMS IN ON SAMPLER TIME w BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK, ETC. 0 PER DEPTH FOOT @ BOT 0 6 6 12 12-18 (MIN) MOIST ELEV — 6" Topsoil 1 ss 24" 18" 3'0" 5 6 compact Brn F sand 5 5 moist Gry/blk F sand,some silt.lit F-C gravel 5 2 ss 24" 16" 7'0" 17 15 dense 24 32 dry 8' Brn F-C sand&F-C rave;,cobbles(filli Boulders or Bedrock 9' Auoer Refusal 10 EOB 9' 15 20 i I I 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT. USED CASING THEN CASING TO FT. HOLE NO. B-1 A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H.S.A.= HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35 50% F=FINE SOILTESTING, INC. CLIENT: Woodard& Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-2 OXFORD, CT 06478 PROJECT NO. G68-2472-23 CT (203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY (914 946-4850 Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road MK/e _ Larchmont NY INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 %" 1 3/8" DATE FINISH 4/10/23 AT 13_FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV. AT FT AFTER—HOURS HAMMER FALL 30" GROUND WATER ELEV. SAMPLE BLOWS PER 6 IN CORE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL. = CASING OR CHANGE COLOR, LOSS OF WASH WATER SEAMS IN ON SAMPLER TIME o BLOWS NO Type PEN REC DEPTH (FORCE ON TUBE) FTR CONSIST DEPTH ROCK, ETC 0-6 6-12 12-18 FOOT @ BOT (MIN) MOIST ELEV 6" ITopsoill 1 ss 24"1 14" TO" 4 5 loose Brn F sand " rmict r;rv/hlk F canrl R 611 5 2 ss 24" 10" 2 1 vloose 2 2 dry Bm F-M sand,trace F-C gravel,trace silt.glass(fill) 10 3 ss 24" 10" 12'0" 2 3 loose 3 3 v moist Brn F-M sand,trace F-C gravel,some silt.plastic(fill) 13' 15 4 ss 24" 20" 17'0" 3 6 compact 156" Blk organic silt 10 14 wet 16' Gry F sand&silt Gry F sand 20 5 ss 24" 20" 22'0" 8 12 compact 14 18 1 1 wet 22' lGry F-C sand&F-C gravel.trace s,lt EO8 22' 25 30 35 (NOTE:Jars labeled B-3) 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT USED CASING THEN CASINC TO FT. IHOLE NO. B-7— A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H-S.A = HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED: TRACE=0- 10% L ITTL E= 10-20%" SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT: Woodard & Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-3 OXFORD, CT 06478 PROJECT NO. G68-2472-23 CT (203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY(914) 946-4850 _ Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road MK/eq Larchmont NY INSPECTOR CASING SAMPLER, CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 1/a" 1 3/8" DATE FINISH 4/10/23 AT 5 FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV AT FT AFTER—HOURS HAMMER FALL 30" GROUND WATER ELEV. SAMPLE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL = CASING BLOWS PER 6 IN CORE OR CHANGE COLOR LOSS OF WASH WATER SEAMS IN TIME ~ BLOWS NO Type PEN REC ON SAMPLER PER CONSIST DEPTH ROCK ETC 0 PER DEPTH (FORCE TUBE) FOOT @ BOT 0-6 6 122 FT 12-18 (MIN) MOIST ELEV 6" Topsoil 1 ss 24" 20" 3'0" 6 9 compact Brn F sand 12 14 dry 2'6" Bm F sand.lit F-C gravel,lit silt,glass.fraqments Blk F-C sand,lit F-C gravel 5 2 ss 24" 16" TO" 2 1 v loose 5'6" Same(lit wood)((fill) 2 1 wet Blk organic silt 9'6„ 10 3 ss 7" 6" 107' 47 50/1" denseidry Weathered Bedrock fragments 12'6" Auger Refusal E013 12'6' 15 20 25 30 35 Note Jars laoeied B-2 L 1 1 1 1 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE 10 FT. USED CASING THEN CASING TO FT HOLE NO. B-3 A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H.S.A.= HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED: TRACE=0- 10% LITTLE= 10-20% SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT Woodard & Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-4 OXFORD, CT 06478 PROJECT NO. G68-2472-23 CT(203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY (914) 946-4850 Per Plan FOREMAN-DRILLER LOCATION A 130 Hommocks Road AK/sb _ Larchmont NY INSPECTOR CASING SAMPLER COREBAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 V 1 3/8" DATE FINISH 4/10/23 AT 8 FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV. AT FT AFTER HOURS HAMMER FALL 30" GROUND WATER ELEV. SAMPLE BLOWS PER 6 IN CORE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL = CASING OR CHANGE COLOR. LOSS OF WASH WATER. SEAMS IN ON SAMPLER TIME LU PER DEPTH BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK. ETC FOOT @ BOT 0-6 6-12 12-18 (MIN) MOIST ELEV 1 ss 24" 24" 2'0" 1 4 compact 10" Topsoil 12'layer of It brn F sand 9 9 dry Blk F-M sand,silt 2 ss 24" 10" 4'0" 9 9 compact 18 12 dry Same,F-M sand,some brick,glass 5 3 ss 24" 18" 6'0" 2 3 loose 2 6 dry Same,wood,gravel(fill) 4 ss 24" 0" 8'0" 4 2 No recovery(fill) 1 2 5 ss 24"1 4" 107 1 1 v loose 10 1 2 dry 10' Brn F-M sand.silt,some C sand(poss fill) _ Blk/gry F-M sand&organic silt,lit C sand roots 15 6 ss 24" 6" 17'0" 10 20 dense 23 23 17' 1Gry F sand&silt,lit M sand,lit wood EOB 1T 20 25 - 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT USED CASING THEN CASING TO FT IHOLE NC. B-4 A=AUGER UP= UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H S A = HOL LOW STEM AUGER M=MEDIUM PROPORTIONS USED: TRACE=0-10% LITTLE= 10-20% SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT Woodard & Curran SHEET I of 1 90 DONOVAN RD. HOLE NO. B-5 OXFORD, CT 06478 PROJECT NO G68-2472-23 CT (203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY (914) 946-4850 Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road AK/sb Larchmont NY INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 1/4" 1 3/8" DATE FINISH 4/10/23 AT 10_FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV. AT FT AFTER HOURS HAMMER FALL 30" GROUND WATER ELEV SAMPLE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL. = CASING BLOWS PER 6 IN CORE OR CHANGE COLOR LOSS OF WASH WATER, SEAMS IN ON SAMPLER TIME w BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK. ETC PER o FOOT DEPTH BOT 0 6 6-12 12-18 FT (MIN) MOIST ELEV 1 ss 24" 20" 2'0" 4 4 loose 2" Topsoil _ 1 5 6 dry Lt brn F sand,trace silt 2 ss 24' 20" 4'0" 6 5 loose 5 5 dry Dk bm/blk F sanf&silt.trace M snd,clay(fill) 5 3 ss 7" 7" 4'7" 25 5011" dense/dry Same,dk brn F sand&organic silt 4 ss 24' 8" Tl0" 2 1 V loose 1 1 dry Blk F sand&organic silt.roots wood 10 5 ss 24" 20" 12'0" 1 1 loose 3 2 wet Same.&wood..roots 15 6 ss 24" 20" 17'0" WOH 2 loose 2 3 moist 17' Gry F sand.silt,clan EOB 17' 20 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT. USED CASING THEN CASING TO FT -5 A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H S A = HOLLOW STEM AUGER M= MEDIUM PROPORTIONS USED: TRACE=0- 10% LITTLE= 10-20% SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT: Woodard & Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-6 OXFORD, CT 06478 PROJECT NO. G68-2472-23 CT (203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY (914) 946-4850 Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road MK/eq _ Larchmont NY _ INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4110/23 GROUND WATER OBSERVATIONS SIZE I.D 4 Y4" 1 3/8" s DATE FINISH 4/10/23 AT 11 FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV. AT FT AFTER—HOURS HAMMER FALL 30" GROUND WATER ELEV SAMPLEDENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL. = CASING BLOWS PER 6 IN CORE OR CHANGE COLOR LOSS OF WASH WATER. SEAMS IN ON SAMPLER TIME w PER DEPTH BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK, ETC. 0 0-6 6-12 12-18 FOOT @ BOT (MIN) MOIST ELEV 1 ss 24" 18" 2'0" 3 3 loose 6" Topsoil,Brn F sand 3 4 moist Grylbm F sand&silt with root fiber 5 2 ss 24" 20" TO" 9 11 compact 16 24 moist Blk gry F-C sand.lit F-C gravel trace silt,glass.wood(fill) 9' 10 3 ss 24" 18" 12'0" 1 1 son 2 2 moist Blk organic silt,lit organics.root fiber 14 15 4 ss 24" 16" 17'0" 12 12 compact 11 16 wet Brn F-C sand 20 5 ss 8" 6" 207" 9 50/2"' dense`wet 207" Bm F-C sand.trace F-C gravel,trace silt EOB 20'7' 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT USED CASING THEN CASING TO FT HOLE NO. B-6 A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBF SAMPL ER H S.A.= HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED: TRACE=0-10% LITTLE= 10-20% SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT: Woodard&Curran SHEET I OF 1 90 DONOVAN RD. HOLE NO. B-7 OXFORD,CT 06478 PROJECT NO. G68-2472-23 CT(203)262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY 914 946-4850 Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road MK/eq Larchmont NY INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 W 1 3/8" DATE FINISH 4/10/23 AT 10_FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV. AT FT AFTER—HOURS HAMMER FALL 30" GROUND WATER ELEV. SAMPLE BLOWS PER 6 IN CORE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL x ON SAMPLER CASING TIME OR CHANGE COLOR,LOSS OF WASH WATER,SEAMS IN � o BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK,ETC. PER DEPTH 0-6 6-12 12-18 FT FOOT @ BOT (MIN) MOIST ELEV 6' Topsoil,Bm F sand 1 1 ss 24' 18' TO' 4 4 loose Bm F sand 5 6 dry Blk F sand,some silt(glass)wood 5 2 1 ss 24" 20' TO' 12 12 compact 9 8 dry Bm F-C sand,some F-C gravel,glass fragments(fill) 10 3 ss 8' 1 4' 10'8' 12 50/2' densetwet Boulders(poss concrete) 14' Auger Refusal 15 EOB 14' 20 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT. USED CASING THEN CASING TO FT. A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H.S.A.= HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT: Woodard &Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-8 OXFORD, CT 06478 PROJECT NO. G68-2472-23 CT(203) 262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY (914) 946-4850 _ Per Plan FOREMAN-DRILLER LOCATION 130 HOmmocks Road AK/sb Larchmont NY INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 %," 1 3/8" DATE FINISH 4/10/23 AT 6 FT AFTER 0 HOURS HAMMER WT. 140# BIT SURFACE ELEV AT FT AFTER—HOURS HAMMER FALL 30" GROUND WATER ELEV. SAMPLE BLOWS PER 6 IN CORE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL. = CASING OR CHANGE COLOR LOSS OF WASH WATER SEAMS IN ON SAMPLER TIME w BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK. ETC 0 PER DEPTH 0-6 6-12 12-18 F7 FOOT @ BOT (MIN) MOIST ELEV 1 ss 24" 10" 2'0" 2 2 loose 6" Topsoil/Lt brn F sand,lit sill 2 dry 5"Gry(blk F sand,silt.trace M sand,lit clay 2 1 ss 24" 15" 4'0" 5 7 compact Blk F-M sand&silt,lit C sand,trace glass(fill) 6 4 dry Same 5 3 ss 23" 18" 511" 5 8 compact 12 50/5" dry 6' Brn F-M sand&silt:Some C sand trace F gravel 4 ss 24" 10" 10'0" 2 2 loose 9' Blk alass.wavel 10 2 2 wet Blk/gry F sand&organic silt,clay.roots(peat) 5 ss 24" 12" 12'0" 1 1 v loose 1 1 wet Gry F sand&organic silt,clay,roots(peat) 15 6 ss 24" 20" 1 TO" 1 1 loose 3 5 wet 17' Gry F sand&silt,clay EOB 17' 20 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT USED CASING THEN CASING TO FT. A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H.S.A.= HOLLOW STEM AUGER M= MEDIUM PROPORTIONS USED: TRACE=0-10% LITTLE= 10-20% SOME=20-35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT Woodard &Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-9 OXFORD, CT 06478 PROJECT NO G68-2472-23 CT(203)262-9328 PROJECT NAME Hommocks Middle School BORING LOCATIONS NY(914)946-4850 Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road AK/sb Larchmont NY INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I D 4'/4" 1 3/8" DATE FINISH 4/10/23 AT 9 FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV AT FT AFTER HOURS HAMMER FALL 30" GROUND WATER ELEV SAMPLE BLOWS PER 6 IN DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL = CASING CORE OR CHANGE COLOR. LOSS OF WASH WATER,SEAMS IN BLOWS NO Type PEN REC ON SAMPLER CONSIST DEPTH ROCK. ETC PER yp DEPTH (FORCE ON TUBE) P E PER FOOT @ BOT 0 6 6 12 12 t8 (MIN) I MOIST ELEV 1 ss 24' 15" 2'0" 2 3 loose 2" Topsoil 13"tan F-M sand,lit silt 4 4 dry 10'blk VF sand&silt,trace roots,F gravel,organice 2 ss 24' 10' 4'0" 5 6 loose 4 5 dry BIk/brn F-M sand&sift,some C sand,F gravel trace wood,organics 5 3 ss 24' 2" 6'0" WOH WOH WOH WOH moist Blk F sand&sift.some wood,lit M sand 4 ss 24" 18' 8'0" 2 2 compact 11 7 moist Same,some C said,melted garbage chunks,fill 5 ss 24' 6' 10'0" 9 6 compact 10 5 4 wet Blk F sand,some organic sift&wood roots 6 ss 24" 0' 12'0" 2 2 vloose 1 1 wet No recovery 15 15' 7 ss 24" 24' 17'0' 2 3 loose 2 4 wet Gry F sand&clayey silt,lit M-C sand I20 — --- 8 ss 24" 24" 22'0' 6 15 compact 14 14 wet 22' IGry F-M sand,some silt,some C sand EOB 22' 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT USED CASING THEN CASING TO FT A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H S A = HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED. TRACE=0 10% LITTLE=10-20% SOME=20 35% AND=35-50% F=FINE SOILTESTING, INC. CLIENT: ` Woodard & Curran SHEET 1 OF 1 90 DONOVAN RD. HOLE NO. B-10 OXFORD, CT 06478 PROJECT NO. G68-2472-23 _ CT (203) 262-9328 PROJECT NAME BORING LOCATIONS NY (914) 946-4850 Hommocks Middle School Per Plan FOREMAN-DRILLER LOCATION 130 Hommocks Road MK/eq _ Larchmont NY INSPECTOR CASING SAMPLER CORE BAR OFFSET TYPE HSA SS DATE START 4/10/23 GROUND WATER OBSERVATIONS SIZE I.D. 4 '/4" 1 3/8" DATE FINISH 4/1 0/23 AT 10 FT AFTER 0 HOURS HAMMER WT 140# BIT SURFACE ELEV AT FT AFTER—HOURS HAMMER FALL 30" GROUND WATER ELEV SAMPLE DENSITY STRATA FIELD IDENTIFICATION OF SOIL REMARKS INCL = CASING BLOWS PER 6 IN CORE OR CHANGE COLOR. LOSS OF WASH WATER, SEAMS IN ON SAMPLER TIME o BLOWS NO Type PEN REC (FORCE ON TUBE) PER CONSIST DEPTH ROCK, ETC PER DEPTH FOOT @ BOT 0-6 6-12 12-18 (MIN) MOIST ELEV 1 ss 24" 18" 2'0" 1 3 loose Lt bm F sand trace silt 5 7 dry Blk/dk brn F-M sand&silt.trace brick,glass.(fill) 2 ss 24" 18" 47 4 6 compact 15 10 dry Blk/gry F sand.silt,trace clay.M sand,brick 5 3 ss 24" 7" 67 3 6 compact 9 3 dry Blk F-M sand&organic silt.lit C sand.brick 4 ss 24" 12" 8'0" 6 5 loose 3 50 moist Same,some F gravel,wood(fill) 10 10, 5 ss 14" 12" 127 3 5 v dense Blk organic silt&organics(peat) 50/2" wet 15 16' 6 ss 24" 20" 17'0" 3 5 compact 16'6" Gry F sand,silt,clay,trace C sand,F gravel 6 5 wet 17' Brn F-M sand,silt,trace wood EOB 17' 20 25 30 35 40 NOTE: Subsoil conditions revealed by this investigation represent conditions at specific locations and may not represent conditions at other locations or times. GROUND SURFACE TO FT USED CASING THEN CASING TO FT. A=AUGER UP=UNDISTURBED PISTON T=THINWALL V=VANE TEST WOR=WEIGHT OF RODS WOH=WEIGHT OF HAMMER&RODS C=COARSE SS=SPLIT TUBE SAMPLER H.S.A.= HOLLOW STEM AUGER M=MEDIUM PROPORTIONS USED. TRACE=0-10% LITTLE=10-20% SOME=20-35"/ AND=35-50% F=FINE PROPOSED BORING LOCATION PLAN HOMMOCKS MIDDLE SCHOOL FIELD INVESTIGATIONS Legend TOWN OF MAMARONECK, NY f'k(}POSED BORING lB-X j s-, IOCIX sz s-�o B-5 APPROXIMATE LOCATIONS OF EXISTING STORM AND SANITARY LINES 3 Q.a rk Ice Rinks-e 11-7oogle Earth 00 S' HOOt '-!Ei.D NVESTIGATIONS Legend !Pt lAAiVIARONrE-C;K, Nll'.-) A? LINES 4b PW arK Ice Rink �Google Earth 200 ft—