HomeMy WebLinkAbout2018_04_16 Board of Architectural Review Minutes Board of Architectural Review
April 16,2018
Present: Edward Jacobson, Chairman,Joseph Shein, Ken Ricci, Diane Neff
Also Present: Jeffery King, Liaison
CALL TO ORDER
The meeting was called to order at 8:05PM
MINUTES
The minutes of March were not discussed.
1. 2543 Boston Post Road
No one appeared to discuss the plantings around the pylon sign.
2. 144 Weaver Street Weaver Gardens Sign
Brian Cullen, from Gotham Signs addressed the Board. He explained the post and panels signs, size,
placement and colors. The one sided panel measures 37.92 X 61.06 attached to 4X 4 posts 77.56 in total
height. The colors are blue background with white and green lettering. The placement is slightly up
Weaver Street, because of the bus stop shelter on Palmer Avenue.
Plantings were discussed, Mr. Cullen stated as it is a nursery, plants will most likely be rotated
seasonally.
The existing chain link fence was discussed.
Lighting was discussed; Mr. Cullen stated he is not proposing any lighting. Mr.Jacobson stated if they
wish to illuminate the sign they would have to come back before the Board.
Motion: To approve the sign as submitted
Action: Approved
Moved by Ken Ricci,seconded by Joseph Shein
Vote: Edward Jacobson, Chairman, Diane Neff, Ken Ricci,Joseph Shein
ADJOURNMENT
The meeting was adjourned at 8:28 P.M.
Min sd by A4.0
Francine M. Brill
Board of Architectural Review Secretary